Earth First! Summer Gathering, August 2015

Update: see earthfirstgathering.org for an inspiring and exciting programme and more.

Exciting plans are taking shape.  Get involved by coming along to the EF! Winter Moot in Bristol.

Email: summergathering AT earthfirst.org.uk

Update: see earthfirstgathering.org for an inspiring and exciting programme and more.

Exciting plans are taking shape.  Get involved by coming along to the EF! Winter Moot in Bristol.

Email: summergathering AT earthfirst.org.uk

Call out for protectors at Bristol camp to protect trees, wildlife and allotments

http://risingup.org.uk/wp-content/uploads/2015/02/DSF2762.jpg

http://risingup.org.uk/wp-content/uploads/2015/02/DSF2762.jpg

The Rising Up camp to protect trees, wildlife and allotments in NE Bristol from the planned Metrobus road needs protectors urgently to come and be on site. Please share with your networks.

More details go to:

https://www.facebook.com/profile.php?id=100008701005657&fref=ts

http://risingup.org.uk/category/news/

How to get there/involved

Video interviews (around 6 minutes long and 72MB in size.)

Ten Arrested at Seneca Lake Fathers and Grandfathers Blockade

photo from popular resistance

February 7th, 2015

Nine men and one woman were arrested Wednesday morning and charged with trespass, part of the ongoing protest at the Crestwood Midstream facility north of Watkins Glen.

Houston-based Crestwood wants to store up to 88 millions gallons of liquid propane and butane in underground salt caverns near Seneca Lake. The company is awaiting state Department of Environmental Conservation approval.

Protesters also have cited the Federal Energy Regulatory Commission’s decision to allow Crestwood to expand natural gas storage at its 576-acre property as a reason for picketing.

The group apprehended Wednesday was participating in what they termed a “Fathers and Grandfathers Blockade” at the site.

About 200 people have been arrested since protests began in September.

Two of those charged Wednesday, John Dennis ofLansing and Daryl Anderson of Hector, are teachers. Both said they were protesting in memory of the deaths of their respective sons two years ago.

Dennis and Anderson met in a local bereavement group and drove to the protest together.

Italy – No TAV: Convictions and Tear Gas on the Motorway

 

 

scontri27.6.2011Maddalena1

(June 27th, 2011: Eviction of the Free Republic of Maddalena)

February 3rd, 2015

from Contra Info

NO TAV (No to the High Speed Train) movement, which is based in the Susa Valley (Italy) in Piedmont and which opposes the creation of the new high speed railway line between Turin and Lyon in France. This line is part of a EU project which plans to connect Lyon to Budapest and then onto Ukraine

The so-called ‘No TAV mega-trial’ has finished at first instance, in which 53 comrades are involved over the eviction resistance of the Free Republic of Maddalena on June 27th, 2011, and for the attack of the construction site of Chiomonte on July 3rd that followed. Charges of causing bodily-harm and aggravated violence, resistance against custodial staff of the public authority, defacement and covering faces (masking up) became sentences which varied between a few months and four and a half years in prison for 47 defendants. Heavy sentences, but less than the requests of the prosecutors Pedrotta and Quaglino—who, on October 7th, 2014, demanded 200 years of prison in total—except for a few comrades, against whom the judge decided to tighten the screw a bit more than what was proposed by the prosecution. On the other hand, six people were acquitted of charges.

When leaving the room, the No TAV supporters present at the trial invaded and blocked the route of Corso Regina Margherita for about twenty minutes in both directions, at the point of the bunker room [the special court of Torino, built into the Vallette jail, near the beginning of the motorway], to protest against the sentences given by the judges.

Another gathering happened the same afternoon at Bussoleno train station at 6pm. This transformed into a march of about 250 people, who at first blocked the main road, then tried to invade the motorway. The police managed to put themselves in the way in time to prevent this first attempt, but then were quickly bypassed by a large group of protesters, who scattered through the meadows, and seized one of the two sides of the motorway. The occupation of the motorway lasted approximately half an hour until the arrival of other police forces that attacked with shots of tear gas and some charges. Five comrades were arrested during these events, two of whom were released shortly after. The motorway was then reopened, well protected by officers, whilst the main road was still blocked. At around 11.30pm, the three No TAV arrested during the police charges on the motorway were then released with a summons to the court.

Translated and (a tiny bit) adapted from Macerie

A large protest has been called on February 21st in Turin to demonstrate that everything continues and that the 145 years of prison-time which were distributed do not diminish the determination of the No TAV struggle

More Info (in Italian)

Peru’s Indigenous People Blockade Oil Company on River Tigre

Florida Earth First!ers Storm Developer’s Offices and Lock Down

inside-kolter-1-4

January 26th, 2015

inside-kolter-1-4

January 26th, 2015

Over 20 protestors rushed the offices of Kolter Group’s “Kolter Urban” branch building with signs, banners, air-horns and other noisemakers, demanding that the permits for Kolter’s development of the Briger Forest be revoked. Amidst the chaos, two eco-warriors entered the lobby and locked down throat-to-throat, disrupting business as usual for two and a half hours.

This action occurred because Kolter plans to build 360 houses and townhomes in the Briger Forest, a 681-acre tract of land in Palm Beach Gardens, Florida. They are working off deeply flawed permits and have cleared a massive access road which was never approved by South Florida Water Management District. Another concern is the recent relocation of the area’s gopher tortoises and the destruction of the tortoise’s burrows, which provide habitat for several other species, including the endangered Eastern indigo snake.

0

“There’s so little of the wild left in this area, it just doesn’t make sense for them to be cutting this,” said Juan Chévere, one of the two who locked down. “We don’t need more development, more urban sprawl. For what? So Kolter can make a buck and Scripps can build animal testing labs? No thanks. The forest is surrounded by schools, it should be treated as an educational resource.”

When the extraction team arrived, it was requested that a medic be allowed to observe–this request was denied. It was then requested that the extraction team wait until an EMT arrive–this too was denied.

Before the cutting began, the support team was forced to leave. Shortly thereafter, one of the people locked down was taken to the hospital for injuries to the knee reportedly inflicted by a police officer. (At the time of this writing, no further details are known).

inside

Everglades Earth First! has been fighting the development of the Briger Forest since it was first proposed over ten years ago. In November, two members of Everglades Earth First! locked themselves to a disabled van to prevent entrance to the construction site. In 2011, there was a six-week-long treesit inside the forest.

http://player.vimeo.com/video/117317937

Roybon, France: Open Barricade Festival

zadroybon-400x519

zadroybon-400x519

The 7th, 8th and 9th February 2015 an OPEN BARRICADE Festival will take place on the zone à défendre (ZAD) of Chambarans, against deforestation and the construction of a Center Parcs. Two days of building original barricades of course.

Meet Saturday 7th February at 10am at Lake Roybon, starting at midday for a picnic at 1pm on the zone, then building barricades and cabins to occupy and defend the zone.

Bring building materials, tools, all your mates and waterproof and warm clothes.

For the programme; workshops, shows, canteens and Saturday night concert. Detailed program to come.

http://zadroybon.noblogs.org/

 

from Squat.net

Sapotaweyak Cree Nation Sets Up Blockades

sapotaweyak-cree-nation

January 26th, 2015

sapotaweyak-cree-nation

January 26th, 2015

Members of a western Manitoba aboriginal community are peacefully protesting work on the Bipole III hydroelectric line, a transmission project that requires the construction of a transmission line, two new converter stations and two ground electrodes for those stations.

That construction will involve clear-cutting trees near Sapotaweyak Cree Nation, located north of Swan River in central Manitoba.

On Saturday, members of the community set up two blockades along Highway 10 to prevent access for workers who are scheduled to cut down trees, and they ignited a sacred fire in the clear-cutting path.

A judge denied the First Nation’s request for an injunction to stop construction in an area known to the community as N4, until the province properly consulted with the community in January.

The area includes Sapotaweyak Cree Nation’s ancestral lands and traditional territory, which includes burial and spiritual sites sacred to the community.

Chief Nelson Genaille says RCMP spoke briefly with him and allowed the peaceful protest to continue.

“Our people are now standing up for their rights and interests,” Genaille said.

“I have exhausted the diplomatic and legal routes to voice our concerns against this project. And regrettably, the responsible Manitoba ministers and Manitoba Hydro bigwigs did not take our concerns seriously.”

Noname

More news 28/1/15

Earth First! Winter Moot (Bristol): 20th-22nd February 2015 /full programme

A weekend gathering for people involved or wanting to know more about ecological direct action around the UK including fighting opencast coal, fracking, GM, nuclear power, new road building and quarries with discussions and campaign planning – emphasis on the tactics and strategies, community solidarity and sustainable activism.

Sharing stories, skills, tactics, updates & analyses of the radical ecological movement

Cost scale £20 to £30 . This includes full vegan meals and accommodation. Arrive Friday evening (programme starts at 7pm), leave Sunday (ends by 4pm). It will be an indoor floor sleeping space so bring a warm sleeping bag and mat to

Kebele Community Centre 14 Robertson Road Easton Bristol BS5 6JY
TrainTo Stapleton rd , two stops from Bristol TM then 7min walk —

Earth First! is a network of people and campaigns who fight ecological destruction and the forces driving it. We believe in non-hierarchical organising of Direct Action, to confront, stop and eventually reverse the forces that are responsible for the destruction of the Earth and its inhabitants. EF! is not a cohesive group or campaign, but a convenient banner for people who share similar philosophies to work under and doing it ourselves rather than relying on governments or industry.

For info or offers southwest.earthfirst@riseup.net www.earthfirst.org.uk

Download the (ready-to-print) flyer

 

Programme subject to change:

Starts 7pm Friday with dinner, followed by films & an intro to EF!

On Saturday, breakfast is before the 9:30am start with campaigns round-ups and legal & security workshops.  After lunch we'll be looking at strategic thinking (see below) and at 5 exploring the relationship between Reclaim the Power and EF!

On Sunday we'll continue those explorations from 10am.  After lunch, there'll be a workshop on sustainable activism, and a chance to get involved in organising the EF! Summer Gathering.  Please stay for that if you can and get involved. 

 

Workshops include:

Intelligent Resistance: strategy and its implementation in the modern world

Summary: Strong strategy has always been a key element of successful resistance movements. Whether it be the anarchist movements of revolutionary Spain, or the contemporary fight against fracking, a solid strategy is proven to be indispensable.‘Intelligent Resistance’ is a basic introduction to strategic thought and action and looks to provide those in attendance with a practical set of theoretical tools to take away and apply to their own movements and practice.

Sustaining Resistance: avoiding ‘Burn out”

This is a taster workshop from a much longer ten day workshop and offers a range of tools, collective and personal, which can make our activism more effective and help us avoid burn out staying in for the long haul.

Reclaim the Power meets Earth First!”

How can Earth First! and Reclaim the power coexist in the future struggles and is there a need for collaboration between other camps or a consolidation of resources?

Legal Defence Monitoring:

A taster session in how to be an effective LDM on actions and demos.

Campaigns go-round:

Dates for your diary and what resistance is going on around the world and your back yard..

Italy’s No-TAV Movement Heats Up with Major Sabotage and Court Victory

photo from protest in the forest atta

photo from protest in the forest attacked by police in 2011

from Earth First! News

December 29th, 2014Advocates of the impossibly corrupt and environmentally devastating high speed rail project known as TAV that threatens to cut through the Alps received a double-blow last week in the form of a major court victory for activists, and another large-scale act of arson.

This month, six fires have been set along the TAV lines in Italy, with militant groups like Armed Operational Nuclei (NOA) calling on activists to join them in armed struggle.

Image from the sabotage in Bologna five days ago / courtesy ANSA

Image from the sabotage in Bologna five days ago

As recently as last week, three people wearing hoods set fires at Bologna’s Santa Viola station. Though private surveillance cameras caught their image, they are unidentifiable. According to the Daily Beast, the sabotage was surprisingly effective: “the Bologna fires destroyed the regional train traffic control system, which put the entire rail network in northern Italy on hold until it could be repaired.”

Since the first of December, six fires have been set along Italy’s high-speed rail, causing the fast-moving trains to screech to a halt.

In spite of accusations of terrorism and the controversy surrounding fresh sabotage, three anarchists who were jailed in relation to the blockade of machinery and throwing molotovs at cops had their terrorism charges dropped in court today.

During the action in question, the newswire service ANSA explains, “Police at the time said roughly 30 hooded militants broke into the construction site under the cover of nightfall and tore down fences and blocked machinery. In a nearby incident, several other activists confronted police with fireworks and Molotov cocktails.”

The court victory sends a message that activists fighting the TAV are not simply terrorists pretending to be environmentalists, but members of a diverse and committed movement that encompasses large sectors of the Italian populace.

Investigators are not just out to get activists, either. They are also cracking down on supporters of the TAV—chiefly mafia operatives who have infiltrated the project in order to channel contracts and permits to their syndicates.

Meanwhile, the largest mob of them all, the EU, has made infrastructure a priority, over and against resistant communities and militant groups fighting against the destruction of a simpler way of life.

Diverse crowd of protestors marching from a historical site through the forest set to be destroyed by TAV / by Pietro Bondi