The Pirates of Broadhaven Defeat Shell’s Armada (& contractor’s addresses)

For the sec­ond time in three days a Shell dredger has been board­ed and occu­pied by a Shell to Sea pro­test­er. As a result all the ships work­ing in the bay have ceased work and returned to har­bour. Reports con­firm that work has been aban­doned due to the action of the pro­test­ers!

Dredger occupation the second!For the sec­ond time in three days a Shell dredger has been board­ed and occu­pied by a Shell to Sea pro­test­er. As a result all the ships work­ing in the bay have ceased work and returned to har­bour. Reports con­firm that work has been aban­doned due to the action of the pro­test­ers!

A group of 11 kayak­ers set out at 5:30am on Fri­day, meet­ing instant resis­tance on the water from Shell secu­ri­ty boats and safe­ty boats. After avoid­ing the Shell pri­vate secu­ri­ty boats that were attempt­ing to cap­size the kayaks, one pro­test­er man­aged to board the dredger ‘Rezende Bol’ owned by Van Oord, who is sub­con­tract­ed by Shell to do the dredg­ing. This ves­sel along with anoth­er and mul­ti­ple sup­port and secu­ri­ty boats were dig­ging a trench in the seabed in prepa­ra­tion for the gas pipe-lay­ing ship Soli­taire. Work in the bay has been con­tin­u­ous 24 hours a day since Mon­day evening only stop­ping due to the pre­vi­ous dredger occu­pa­tion by Shell to Sea pro­test­ers which last­ed 10 hours. Dur­ing the attempts to board the dredger sev­er­al pro­test­ers were able to climb onto the side of the ves­sel. Exces­sive force was used to pre­vent them from board­ing; one pro­test­er had his thumb bent back­wards by a secu­ri­ty guard and lat­er was tak­en to the hos­pi­tal where tests revealed dam­aged lig­a­ments. Anoth­er pro­test­er who got on board the ship was vio­lent­ly pushed from the deck by two secu­ri­ty guards injur­ing his back, and fell over six feet from the deck into the water. Shell secu­ri­ty were kick­ing and stamp­ing fin­gers of pro­test­ers on the near side of the ves­sel, all the while one pro­test­er man­aged to board the ship on the oth­er side and climb up onto the same crane his friends had pre­vi­ous­ly occu­pied just three days ear­li­er.

The kayak sup­port team pre­pared for sim­i­lar shifts as Tues­day, antic­i­pat­ing a long-term occu­pa­tion. Four kayak­ers remained on the water to keep an eye on the pro­test­er while the rest went in to regain ener­gy. The reac­tion of the secu­ri­ty and safe­ty boats was very hos­tile, attempt­ing to cap­size kayaks and sep­a­rate peo­ple from each oth­er. The dri­ver of the Gall­tee (Shell’s pri­vate secu­ri­ty boat) repeat­ed his threat to sink kayaks, dri­ving extreme­ly aggres­sive­ly with no regard for the safe­ty of the kayak­ers.

After the dredgers were towed away, the Gar­da arrived and board­ed the ship in addi­tion to the Shell secu­ri­ty already on the ship. They threat­ened the pro­test­er on the crane arm with forced phys­i­cal removal. Fear­ing for his own safe­ty the pro­test­er jumped from the dredger arm onto the deck and dived into the water. The two sup­port­ing kayak­ers who were still in the water were arrest­ed despite their efforts to com­ply with the Gardai’s instruc­tions. In the water the crane pro­test­er man­aged to avoid cap­ture by the Gar­dai and Shell secu­ri­ty and get to the shore where he scaled a cliff to evade cap­ture. His where­abouts are now unknown but he is safe and well!

Shell claimed that they stopped work­ing in the bay due to a ‘swell’ but sources at Bal­ly­glass pier con­firmed that Van Oord, the sub­con­trac­tor run­ning the dredgers were unwill­ing to work with ongo­ing protest activ­i­ty and the exces­sive use of force by the IRMS (Inte­grat­ed Risk Man­age­ment Ser­vices) .

Today’s actions are proof that resis­tance rocks!

Come to Mayo!

—-

Van Oord are involved as a main con­trac­tor on the Lim­er­ick Tun­nel project, which they’re hap­py to tell you about on their web­site, but there’s no men­tion at all of their involve­ment with the Cor­rib Gas Project. Maybe their green­wash is impor­tant to them some­how, and maybe they don’t fan­cy neg­a­tive pub­lic­i­ty. Why don’t we give them some then, eh?

Van Oord’s web­site home­page:
http://www.vanoord.com/gb-en/index.php

Head office postal address for gen­er­al mail:
Van Oord Dredg­ing and Marine Con­trac­tors BV
PO Box 8574
3009 AN Rot­ter­dam
The Nether­lands

Vis­it­ing address:
Van Oord Dredg­ing and Marine Con­trac­tors BV
Water­man­weg 64
3067 GG Rot­ter­dam
The Nether­lands
T 31 10 447844
F 31 10 4478100
E info@vanoord.com

This is a con­tact for their ‘news­room’, i.e. Media and PR:
A.G.M. (Bert) Groothuizen
Man­ag­er Mar­ket­ing & Pub­lic Rela­tions
T 31 10 4478234
F 31 10 4478100
E info@vanoord.com

On their ‘agen­da’ page there is men­tion of this fol­low­ing event. Maybe they are keynote speak­ers at this con­fer­ence, or that they will have a large trade exhi­bi­tion pres­ence there. Details from the con­fer­ence web­site are sketchy, so more research is need­ed. There are oth­er events for lat­er in the year at which they’ll either attend or par­tic­i­pate in, but I think the event at the end of this month may be a place where Van Oord can be shamed pub­licly about its involve­ment in Shel­l’s destruc­tion of Broad­haven Bay.

The Flood and Coastal Risk Man­age­ment Con­fer­ence 2009 — 30 June 2009 — 02 July 2009
The Inter­na­tion­al Cen­tre, Telford, UK
(Telford is in Shrop­shire, west-cen­tral Eng­land, I think. Near­ish to Birm­ing­ham any­way. The risks in coastal man­age­ment must be enor­mous these days, if this con­fer­ence has to be held in a place as far from the sea as you can get on the island of Britain!)
http://www.environment-agency.gov.uk/research/102626.aspx

Allseas are the com­pa­ny that own the Soli­taire. The Soli­taire is expect­ed to arrive with­in the next month. It would be good if peo­ple could also put pres­sure on them before they get here:

http://www.allseas.com/uk

Allseas UK Lim­it­ed
Address: Knyvett House The Cause­way
City: Staines, Mid­dle­sex
Post­code: TW18 3BA
Tele­phone: +44 1784 898038
Fax: +44 1784 898030

Shell security breached and work stopped in successful action at sea

On Tues­day, after the after­noon con­fronta­tion in Broad­haven Bay which result­ed in one man’s arrest and a cou­ple hours of halt­ed work for the dredgers, the Shell to Sea fleet of kayaks head­ed out on the water a sec­ond time around 6pm and two pro­test­ers man­aged to board one of the dredgers, climb­ing on to the neck of the c

Shell crane occupation in Broadhaven BayOn Tues­day, after the after­noon con­fronta­tion in Broad­haven Bay which result­ed in one man’s arrest and a cou­ple hours of halt­ed work for the dredgers, the Shell to Sea fleet of kayaks head­ed out on the water a sec­ond time around 6pm and two pro­test­ers man­aged to board one of the dredgers, climb­ing on to the neck of the crane, occu­py­ing it and halt­ing work for 10 hours.

Shell has been con­tin­u­ous­ly dredg­ing in the area since Mon­day evening, inter­fer­ing with pro­tect­ed fish­ing areas for local fish­er­men, defil­ing what was once a pris­tine marine habi­tat full of dol­phins, whales and oth­er marine life, and dis­turb­ing sleep for local res­i­dents. They have buoyed off an ‘exclu­sion zone’ in the pub­lic waters, with boats patrolling the area to make sure no one cross­es into it. There is a diverse assort­ment of ves­sels occu­py­ing the once pris­tine bay; the major­i­ty of these are either car­ry­ing out or assist­ing in the cur­rent dredg­ing and sur­veil­lance oper­a­tions. An Gar­da Siochana (police boat) have also been patrolling the work zone along with two black RIBs; The Lau­ra Emi­ly accom­pa­nied by its twin the Gall­tee, both brim­ming with men dressed in black mil­i­tary fatigues and video cam­eras for film­ing pro­test­ers. Oth­er small­er motor­boats accom­pa­nied the Shell crew, includ­ing ‘safe­ty boats’ and a large white motor launch. There were tug­boats for mov­ing the dredgers, barges for hold­ing the sand being removed from the seabed and, of course, the mas­sive dredgers them­selves.

A group of twelve Shell to Sea pro­test­ers in eight inflat­able kayaks, two hard kayaks, and two rub­ber dingys set out on the water at 6pm for the sec­ond time in one day on Tues­day 2nd June. Three of the kayaks man­aged to evade the secu­ri­ty boats and get close enough to board one of the dredgers. One pro­test­er began to climb the lad­der from her boat while anoth­er kayak­er blocked a secu­ri­ty boat from grab­bing her. The oth­er pro­test­er used the tires on the side of the dredger to board the deck. Once on the boat, both pro­test­ers were climb­ing onto the crane with­in sec­onds. They slid down into the neck of the crane mak­ing it impos­si­ble for the crew to remove them.

Loud cheers were heard from ashore where peo­ple were gath­ered at the Ross­port Sol­i­dar­i­ty Camp, and the mood on the water was extreme­ly pos­i­tive. ‘Shell to hell’ chants were abound­ing, and there were even some play­ful exchanges between Shell to Sea kayak­ers and a cou­ple of motor­boats. There were vary­ing atti­tudes on dif­fer­ent boats, but not all of the gar­dai or safe­ty boats were unfriend­ly. Both inflat­able kayaks which had been left in the water where the two pro­test­ers had board­ed the dredger were quick­ly recov­ered. One was towed out of the ‘exclu­sion zone’ by a Shell to Sea pro­test­er, and one was brought on board the gar­dai boat and placed back in the water out­side of the exclu­sion zone. The rest of the Shell to Sea kayak­ers remained on the water to ensure the pro­test­ers were not going to be dan­ger­ous­ly removed, then began tak­ing shifts to stay close to them and pro­vide sup­port.

In a sur­pris­ing­ly hon­est con­ver­sa­tion between the kayak pro­test­ers and a work­er on one of the boats, the work­er stat­ed that he ‘admired the per­sis­tence’ of the local com­mu­ni­ty and sup­port­ers who are resist­ing the pipeline. He also said he thought the pipeline plan was ‘rel­a­tive­ly safe’ and assert­ed that some­times risks have to be tak­en. Unfor­tu­nate­ly with a kill zone of up to 200 meters and the uncer­tain­ty of nev­er hav­ing built such a high pres­sure pipeline through a res­i­den­tial area, the risk is high. This is why resis­tance to the pipeline is so strong; as one of the two pro­test­ers who occu­pied the dredger lat­er stat­ed, “Today we took this action in sol­i­dar­i­ty with the local com­mu­ni­ty and to try to pro­tect this beau­ti­ful area from being rav­aged by Shell.”

The rotat­ing shifts of sup­port con­tin­ued on through the night, with small groups of kayak­ers keep­ing an eye on their friends long after the gar­dai had left around 12am. Once it was dark and the gar­dai had left, the mood at sea changed. The Shell secu­ri­ty and the safe­ty boat for the dredger were the only ones left. The Shell secu­ri­ty RIBs became increas­ing­ly aggres­sive towards the kayak­ers. They made mul­ti­ple attempts to cap­size them, and used intim­i­da­tion tech­niques such as turn­ing their lights off until they were up close then sud­den­ly shin­ing flood­lights, dis­ori­ent­ing and fright­en­ing them. One of the kayak crew report­ed feel­ing seri­ous­ly con­cerned that the sit­u­a­tion would esca­late. A secu­ri­ty guard even stat­ed his inten­tion was to sink the boats, a plau­si­ble threat giv­en the recent vicious attack by IRMS on Willie Cor­duff. It was report­ed that the ‘safe­ty boat’ also seemed con­cerned for the safe­ty of the kayak­ers, and may have been their only pro­tec­tion in the sit­u­a­tion.

By 4am, the two pro­test­ers on the dredger were feel­ing very cold and tired, and felt as if they had achieved a sig­nif­i­cant vic­to­ry. They vol­un­tar­i­ly climbed down from the crane, and were ille­gal­ly detained by IRMS secu­ri­ty and brought to Bal­ly­glass pier where they were arrest­ed and charged with loi­ter­ing in a pub­lic place.

Despite the severe dif­fi­cul­ties encoun­tered through­out the night the mood across the camp from the kayak­ing teams and all the sup­port crews was jubi­lant. Hav­ing breached Shell’s secu­ri­ty and made such a sig­nif­i­cant stop to dredg­ing work peo­ple at the sol­i­dar­i­ty camp remain in a defi­ant mood: watch this space for more resis­tance to the dev­as­ta­tion at sea and on the land.

Peru Indigenous Holding Strong in Standoff

June 3rd 2009
A mas­sive indige­nous mobi­liza­tion in the Peru­vian Ama­zon is near­ing its sec­ond month, with no sign that the native pro­test­ers will allow them­selves to be intim­i­dat­ed into giv­ing up on their demands.

Peru oil boat occupationJune 3rd 2009
A mas­sive indige­nous mobi­liza­tion in the Peru­vian Ama­zon is near­ing its sec­ond month, with no sign that the native pro­test­ers will allow them­selves to be intim­i­dat­ed into giv­ing up on their demands.

Thou­sands of indige­nous pro­test­ers have block­ad­ed crit­i­cal infra­struc­ture in Peru’s Ama­zon region since April 9, when they declared a nation­al strike in protest of new laws that would facil­i­tate increased indus­tri­al exploita­tion of their ter­ri­to­ries for tim­ber, oil and gas. The laws were passed by decree under pow­ers grant­ed to Pres­i­dent Alan Gar­cia to bring to coun­try into com­pli­ance with a US-Peru free trade agree­ment. The 10 laws that pro­test­ers are demand­ing repealed were not part of the trade agree­ment, how­ev­er, and were declared uncon­sti­tu­tion­al by a con­gres­sion­al com­mis­sion in Decem­ber.

So far, indige­nous pro­test­ers have block­ad­ed roads and water­ways, forced a shut­down to the only crude oil pipeline in Peru, forced two oil com­pa­nies to cease oper­a­tion, blocked tourist access to the ruins of Machu Pic­chu (twice), and held protests that par­a­lyzed the region’s biggest city, Iqui­tos. On May 31, sev­er­al hun­dred pro­test­ers took over two valve sta­tions on the only pipeline that trans­ports nat­ur­al gas from the con­tro­ver­sial Camisea gas fields.

The protests are orga­nized under the aus­pices of the Intereth­nic Devel­op­ment Asso­ci­a­tion of the Peru­vian Rain­for­est (AIDESP), which rep­re­sents 1,200 dif­fer­ent native com­mu­ni­ties. AIDESP’s elect­ed leader, Alber­to Pizan­go, insists that the mobi­liza­tion will not end until Con­gress repeals the 10 objec­tion­able laws, declares the state of emer­gency (mar­tial law) declared in 5 Ama­zon­ian provinces since May 9, and enters a good-faith dis­cus­sion with native com­mu­ni­ties over a dif­fer­ent mod­el for devel­op­ing the Ama­zon.

One of the 10 laws has been ten­ta­tive­ly repealed, but this action must be approved by the full Con­gress. The oth­er 9 laws remain on the books.

Anti-Shell actions at Rossport, Eire

2nd June 2009

Ross­port: Cause­way at Shell com­pound ‘washed away’ by Shell to Sea action

2nd June 2009
Removing Shell's causeway at Glengad
Ross­port: Cause­way at Shell com­pound ‘washed away’ by Shell to Sea action

Part of the Shell cause­way extend­ing into the sea at Glen­gad was yes­ter­day evening removed by Shell to Sea pro­test­ers. This was in protest at the ille­gal block­ing of access to the pub­lic beach and to oppose the forc­ing of this unsafe project on the local com­mu­ni­ty and the give­away of Ire­land’s nat­ur­al resources.

A group of about 30–40 peo­ple wad­ed into the sea to gain access to the cause­way, and pro­ceed­ed to remove a large amount of the stone which makes it up. They were con­front­ed by a 70 Shell secu­ri­ty after about half an hour of the action, at which point the peo­ple left. An upbeat and play­ful mood pre­vailed over a beau­ti­ful evening.

The Ross­port Sol­i­dar­i­ty Camp has again tak­en up res­i­dence in Glen­gad, and after a very suc­cess­ful week­end, includ­ing a num­ber of actions, will build up the resis­tance to Shell over the com­ing weeks and months.

—-
Anti-Shell inflatable protest
Mon­day the 1st of June saw the arrival of a mul­ti­tude of assort­ed ves­sels to Broad­haven bay. The boats, which are sub­con­tract­ed by The Roy­al Dutch Shell com­pa­ny (Shell), are attempt­ing to pre­pare for works on the con­tro­ver­sial Cor­rib gas project.

Today how­ev­er, their progress has been sig­nif­i­cant­ly impaired by res­i­dent Shell to Sea activists that had already gath­ered a small, albeit for­mi­da­ble, fleet of kayaks, ready to deploy with­in short notice. The Kayaks were birthed from the Ross­port Sol­i­dar­i­ty Camp, which direct­ly over­looks the vicin­i­ty that the Shell boats have been oper­at­ing in the past twen­ty-four hours.

Cur­rent­ly there are diverse assort­ments of ves­sels con­verg­ing in the once pris­tine bay; the major­i­ty of these are either car­ry­ing out, or assist­ing, dredg­ing and sur­veil­lance oper­a­tions. An Gar­da Siochana, have also been sight­ed patrolling the work zone, along with two black ribs; The Lau­ra Emi­ly accom­pa­nied by its twin the Gall­tee, which are both brim­ming with men dressed in black mil­i­tary fatigues.

Works, tak­ing place ear­li­er this after­noon, came grind­ing to a com­plete halt when twelve activists in kayaks broke through the secu­ri­ty line that con­sist­ed of nine high speed secu­ri­ty boats. The activists man­aged to tact­ful­ly cir­cum­nav­i­gate secu­ri­ty boats for approx­i­mate­ly two and a half hours, which effec­tive­ly halt­ed Shell dredg­ing works for a con­sid­er­able peri­od of time.

After numer­ous attempts by Gar­dai to secure an arrest, they even­tu­al­ly man­aged to drag one man from his inflat­able Kayak. The man, in his fifties, is report­ed to have been halt­ing a dredger con­vey­ing silt into a barge, and thus stop­ping after­noon work.

This cur­rent work being car­ried out by Shell is like­ly to sig­ni­fy the imped­ing arrival of the Soli­taire; at over 400 meters long the Soli­taire is the largest pipe lay­ing ves­sel in the world, and its expect­ed pres­ence in Co. Mayo will undoubt­ed­ly pro­voke for­mi­da­ble resis­tance.

At this point in the project, all dredg­ing works car­ried out in Ross­port are like­ly to be held as sacro­sanct by Shell’s board of direc­tors, and con­verse­ly seen as detri­men­tal by the Irish pub­lic.

South American dam news

2 Arrests in Home Depot Dam Protest; Take Action!

May 27th, 2009

2 Arrests in Home Depot Dam Protest; Take Action!

May 27th, 2009
Two activists were arrest­ed at a Home Depot in Glen­dale, CO, near Den­ver, after hang­ing a ban­ner off the build­ing that read, “Dam Home Depot, NOT Patag­o­nia!” Home Depot is under pres­sure from Inter­na­tion­al Rivers and allies for its ongo­ing finan­cial involve­ment with the main Chilean inter­est pro­mot­ing 5 dams in Chilean Patag­o­nia.

Home Depot has a share­hold­ers’ meet­ing com­ing up on Thurs­day, May 28 in Atlanta, Geor­gia. Con­tact them (before their May 28 share­hold­ers’ meet­ing if pos­si­ble, but cer­tain­ly dur­ing or after as well) and tell them to can­cel pur­chas­es of tim­ber from the Mat­te and Angeli­ni Groups (the com­pa­nies CMPC and Arau­co) for their involve­ment in plans to dam wild Patag­o­nia, and to drop the charges against Earth First! pro­test­ers in Ara­pa­hoe Coun­ty, Col­orado. Call 1–800-553‑3199 (press exten­sion # 5), or send an email direct­ly from this site.

For more back­ground on the issue, vis­it Inter­na­tion­al Rivers’ Patag­o­nia page.

More South Amer­i­can Dam News

Chilean Patag­o­nia: Inter­na­tion­al Rivers deployed two large ban­ners at Home Depot’s annu­al share­hold­er meet­ing in Atlanta, GA, USA, on May 28, demand­ing that the cor­po­ra­tion sev­er ties with the two com­pa­nies push­ing plans to dam 5 rivers in wild Patag­o­nia. Inside the meet­ing, pro­test­ers brought their demands direct­ly to the company’s board.

The action came only a day after 2 Earth First! activists were arrest­ed for drop­ping a sim­i­lar ban­ner off a Home Depot in Col­orado. For more infor­ma­tion on the cam­paign to Dam Home Depot and Save Patag­o­nia, vis­it Inter­na­tion­al Rivers’ Patag­o­nia page.

Brazil: At least 7 peo­ple were killed when a water stor­age dam burst, flood­ing the city of Cocal da Estação, pop­u­la­tion 30,000. Thou­sands were left home­less or with­out elec­tric­i­ty. Fol­low­ing the acci­dent, a Brazil­ian dam expert esti­mat­ed that 200 oth­er dams in the coun­try are at risk of fail­ure.

In bet­ter news, a fed­er­al judge has sus­pend­ed the envi­ron­men­tal per­mit for the Belo Monte dam on the Xin­gu riv­er, due to insuf­fi­cient con­sid­er­a­tion of the effects on indige­nous peo­ple. The Xin­gu dams have drawn a great deal of oppo­si­tion on both legal grounds and from indige­nous nations whose ter­ri­to­ry would be flood­ed or degrad­ed if they go through. They are part of a much larg­er plan to scale up Brazil’s ener­gy infra­struc­ture through the con­struc­tion of mas­sive hydro­elec­tric and nuclear plants.

Peru: The Cen­tral Ashanin­ka del Rio Ene (CARE), rep­re­sen­ta­tive of the indige­nous Ashanin­ka com­mu­ni­ties of the Ene Val­ley, declared its unequiv­o­cal oppo­si­tion to the planned Pak­itza­pan­go hydro­elec­tric dam stat­ing, that “the Ashanin­ka com­mu­ni­ties of the Ene riv­er … Repu­di­ate the use of the Ashanin­ka word Pak­itza­pan­go in light of its spir­i­tu­al and cul­tur­al sig­nif­i­cance for the Ashanin­ka Peo­ple of Peru [and] Demand that any activ­i­ty such as research, pro­mo­tions, reports, meet­ings or pro­pos­als that sup­port or pro­mote the con­struc­tion of the Pak­itza­pan­go dam are imme­di­ate­ly called off. The Ashanin­ka of the Ene val­ley will NOT per­mit the entry of any insti­tu­tion car­ry­ing out any of the men­tioned activ­i­ties.”

Read the full dec­la­ra­tion.

UPDATE (June 4 2009): It appears that the dams planned for Ashanin­ka ter­riotry in Peru are intend­ed to sell elec­tric­i­ty to Brazil, pri­mar­i­ly for min­ing, met­al pro­cess­ing and indus­tri­al agri­cul­ture indus­tries in the East­ern Ama­zon.

Eco-VIllage Occupation London 6th June Update + Other News.

Hel­lo friends,

In this report:

News of the upcom­ing Eco-Vil­lage occu­pa­tion tak­ing place on a dis­used piece of land near Ham­mer­smith start­ing on Sat­ur­day, 6th June (see attached e‑flyer for details).

Eco flyerHel­lo friends,

In this report:

News of the upcom­ing Eco-Vil­lage occu­pa­tion tak­ing place on a dis­used piece of land near Ham­mer­smith start­ing on Sat­ur­day, 6th June (see attached e‑flyer for details).

The lat­est from the Tyt­ing com­mu­ni­ty farm occu­pa­tion — infor­ma­tion on how you can get involved and sup­port the action.

And some inter­est­ing facts about the land in Britain.

ECO-VILLAGE OCCUPATION

The Eco vil­lage occu­pa­tion begins on the 6th June. Meet at Water­loo Sta­tion at 10AM under the clock. Please try to be on time.

********Please Note**********

If you are com­ing for the open­ing stage of the eco-vil­lage occu­pa­tion, you will need to bring a tent, water and food sup­plies. If you have access to kitchen equip­ment and oth­er use­ful tat that you would be OK to loan, please bring it along too.

***************************

The Eco-Vil­lage Occu­pa­tion is about to begin. Infi­nite pos­si­bil­i­ties lie ahead; what will hap­pen depends on what we make it. By cre­at­ing a sus­tain­able com­mu­ni­ty in the heart of the urban jun­gle, we have an oppor­tu­ni­ty to raise the con­scious­ness of urban dwellers all around and shine a light on a way of liv­ing that goes far to solv­ing the prob­lem of the destruc­tion of peo­ple and plan­et.

Dur­ing the last pub­lic plan­ning meet­ing, we had con­sen­sus on the fol­low­ing issues:

- A no vehi­cle on site pol­i­cy. In order to max­i­mize liv­ing space and encour­age peo­ple to come to the vil­lage via sus­tain­able means.

- Acoustic music only. So that we don’t make ene­mies of the neigh­bours.

- All major deci­sions in the eco-vil­lage to be decid­ed via the con­sen­su­al deci­sion mak­ing of all the peo­ple in the eco-vil­lage.

Please come along and join us. Ide­al­ly, we are look­ing for com­mit­ted peo­ple who share in the vision of the eco-vil­lage com­mu­ni­ty and who are able to com­mit for an indef­i­nite peri­od, how­ev­er if you sim­ply want to stay for a night or two or even vis­it for a day, please feel free to come along.

This eco-vil­lage occu­pa­tion is inspired by The Land is Ours which cam­paigns peace­ful­ly for access to the land, its resources, and the deci­sion-mak­ing process­es affect­ing them, for every­one, irre­spec­tive of race, gen­der or age. for more infor­ma­tion, please vis­it:

www.tlio.org.uk

con­tact Car­olyn on: 01727 812369 or Gareth on: 07515 166011 or

diggers360@yahoo.co.uk

Tyt­ing Com­mu­ni­ty Farm Occu­pa­tion.

Six weeks ago a group of peo­ple (some fresh from the Raven’s Ait occu­pa­tion in Kingston) assert­ing their com­mon law right to live and grow food, com­menced the occu­pa­tion of Tyt­ing Com­mu­ni­ty Farm in Half Pen­ny Lane Guild­ford. (a pub­licly owned site which has been vacant for sev­er­al years).

Guild­ford coun­cil (the own­er of the prop­er­ty) has been try­ing with­out suc­cess and with much local oppo­si­tion to sell the com­mu­ni­ty farm off by divid­ing it into small­er lots.

The coun­cil were grant­ed an ‘inter­im pos­ses­sion order’ last Wednes­day (27th May) and threat­ened to send in the police to remove any­one still on the site. On Fri­day morn­ing, var­i­ous con­trac­tors arrived and board­ed up the farm­house (but no police).

Far from dent­ing their morale, the threat of force­ful evic­tion has sim­ply made those enjoy­ing life at the farm more deter­mined to stay their ground.

To see a video of what’s been hap­pen­ing at the farm please click here: http://www.youtube.com/watch?v=PKe_uCHpokU

This occu­pa­tion is open to any­one who would like to be part of the com­mu­ni­ty, grow veg­eta­bles and live in a sus­tain­able way, whilst help­ing to retain com­mon rights to a valu­able and beau­ti­ful piece of com­mon land. If you want to get involved, sim­ply grab a tent and some food (plus some seeds if you have them) and come along. Here is a map of the loca­tion of the farm.

Facts about the land in Britain

did you know that.…

In Britain 70% of land is still owned by less than 1% of the pop­u­la­tion
Less than 8% of the coun­try is under con­crete
50% of the land in Eng­land and Wales remains unreg­is­tered
the Church of Eng­land has ‘mis­laid’ 1.5 mil­lion acres it owned 100 years ago
the Roy­al Fam­i­ly now own or con­trol the equiv­a­lent of an aver­age-sized coun­ty in Eng­land.

* infor­ma­tion cour­tesy of www.who-owns-britain.com

Shell compound breached in Glengad during RSC gathering

May 31, 2009
This after­noon at 5pm, over 200 peo­ple from the local com­mu­ni­ty and the Ross­port Sol­i­dar­i­ty Camp Sum­mer Gath­er­ing attempt­ed to dis­man­tle Shel­l’s ille­gal com­pound at Glen­gad.

Trying to breach Shell compound at GlengadMay 31, 2009
This after­noon at 5pm, over 200 peo­ple from the local com­mu­ni­ty and the Ross­port Sol­i­dar­i­ty Camp Sum­mer Gath­er­ing attempt­ed to dis­man­tle Shel­l’s ille­gal com­pound at Glen­gad.

After a day of direct action train­ing, local peo­ple and their sup­port­ers walked to the south side of the com­pound where they attempt­ed to breach the fence in two places. They were met by strong oppo­si­tion from over six­ty Gar­dai, includ­ing many from the Pub­lic Order Unit.

At least five peo­ple who scaled the fence into the com­pound were held by secu­ri­ty guards and lat­er arrest­ed.

Lat­er in the after­noon, as the crowd were leav­ing, a fur­ther arrest was made when the Gar­dai tar­get­ed a promi­nent cam­paign­er and forcibly detained him for speak­ing out against the actions of the Gar­dai.

Today’s action comes the day after Mau­ra Har­ring­ton was released after 13 days in Mount Joy prison, Dublin for non-pay­ment of fines, includ­ing a one thou­sand euro con­tri­bu­tion to the Gar­da Benev­o­lent Fund.

Around 200 peo­ple are attend­ing the RSC sum­mer gath­er­ing. It’s a beau­ti­ful­ly sun­ny week­end and preper­a­tions are now well under way for anoth­er sum­mer of action against Shell in Mayo, on land and sea. Come and be part of it!

More Arrests on Coal River Valley as Actions Against Mountaintop Removal and Coal Sludge Dams Continue

Non-vio­lent Civ­il Dis­obe­di­ence in Coal Riv­er Val­ley, WV: Sev­en­teen Arrest­ed in Three Sep­a­rate Actions

Non-vio­lent Civ­il Dis­obe­di­ence in Coal Riv­er Val­ley, WV: Sev­en­teen Arrest­ed in Three Sep­a­rate Actions

May 23, 2009: Coal Riv­er Val­ley, WV More than sev­en­ty-five res­i­dents of the Coal Riv­er Val­ley and mem­bers of a coali­tion that includes Moun­tain Jus­tice and Cli­mate Ground Zero pick­et­ed the entrance to Massey Ener­gy’s Mar­fork min­ing com­plex today at noon. Sev­en peo­ple were arrest­ed. The actions were in protest of the com­pa­ny’s plans to blast 100 feet away from the Brushy Fork coal sludge impound­ment.

The demon­stra­tion began with a prayer and ser­mon by Bob “Sage” Rus­so of Chris­tians for the Moun­tains. Ref­er­enc­ing the Ser­mon on the Mount, he called upon cit­i­zens to be stew­ards of the Earth and to move towards sus­tain­able, sta­ble jobs.

Pro­tes­tors stood in front of the gates of the mine facil­i­ty with signs includ­ing “7 bil­lion spilled, 998 killed.”

“Passers­by on Route 3 were over­whelm­ing sup­port­ive with honks, waves, and thumbs up signs,” Rock Creek (Raleigh Coun­ty) res­i­dent Julia Sendor said.

Dur­ing the protest, sev­en peo­ple approached the entrance to the dam facil­i­ty and the Whitesville detach­ment of the West Vir­ginia State Police asked them to leave. When the sev­en refused, the State Police arrest­ed them. Dis­patch­ers say the activists were sent to the South­ern Region­al Jail near Beck­ley, but that infor­ma­tion has not been con­firmed. Bail was report­ed­ly set at $2,000 per per­son.

After the arrests, for­mer U.S. Con­gress­man Ken Hech­ler, a long­time oppo­nent of strip min­ing, gave a speech. He under­scored the respon­si­bil­i­ty of cit­i­zens to safe­guard their free­doms and stand up for their rights.

The protest came just hours after activists car­ried out two non-vio­lent direct actions to protest moun­tain­top removal and coal sludge impound­ments.

This morn­ing, at the Mar­fork facil­i­ty, two peo­ple wear­ing haz­mat suits and res­pi­ra­tors were arrest­ed after boat­ing onto the Brushy Fork impound­ment and float­ing a ban­ner that read, “No More Tox­ic Sludge.” State Police charged the activists with lit­ter­ing and mis­de­meanor tres­pass and trans­port­ed them to the South­ern Region­al Jail. Their bail has been set at $2,000.

At anoth­er action, six activists hung a “Nev­er Again” ban­ner and chained them­selves to a mas­sive dump truck on a Patri­ot Coal-owned moun­tain­top removal mine on Kay­ford Moun­tain. State Police arrived on site to find three peo­ple chained to the main axle of the truck and three oth­ers chained out­side the truck­’s cab. The police removed the six activists, who, along with two oth­ers sup­port­ing them, were trans­port­ed to the Madi­son Coun­ty Cour­t­house, where they were report­ed­ly processed and released.

The tox­ic lake at Brushy Fork dam sits atop a hon­ey­comb of aban­doned under­ground mines. Massey Ener­gy’s own fil­ings with the state Depart­ment of Envi­ron­men­tal Pro­tec­tion project a min­i­mum death toll of 998 should the sev­en-bil­lion-gal­lon dam break. Flood­wa­ters would reach 38.78 feet in height in the town of Pey­tona, 26.61 miles down­stream, with­in three hours and fif­teen min­utes of break­age.

—–

May 26, 2009: BECKLEY, W.Va. — Sev­en­teen moun­tain­top removal activists had no choice but to enforce the laws since all admin­is­tra­tive reme­dies have been exhaust­ed, said some of the activists and sup­port­ers at a press con­fer­ence today. The four still-jailed activists were released on their own recog­ni­zance by Judge Burn­side short­ly after the press con­fer­ence, which was held on the Raleigh Coun­ty Cour­t­house steps.

“I’ve lived in West Vir­ginia most of my life. I’m sick and tired of big busi­ness and the cor­rupt gov­ern­ment telling us what to do,” began Sid Moye of Mer­cer Coun­ty, who par­tic­i­pat­ed in the Pick­et at Pet­tus. “They come in and they can take our land, they can ruin our water and they can take our resources. It’s not right and some­body has to do some­thing about it so we do the lit­tle things that we can.”

Eric Blevins, also arrest­ed in the Pet­tus action, said, “I asked the offi­cer arrest­ing me if Massey is going to be allowed to blast near the dam and he did­n’t want to talk about it. I asked him, does­n’t he have a respon­si­bil­i­ty to enforce the law, and he said ‘Not those laws.’ ”

“We locked down on the Kay­ford moun­tain­top removal site with mud from Min­go Coun­ty on our boots,” Ash­lee Hen­der­son said in a state­ment from the Kay­ford 8, “After we were arrest­ed we had the dust remains from Kay­ford Moun­tain added to that mud.”

“Just because a min­ing per­mit is applied for,” Deb­bie Jar­rell of Rock Creek, Raleigh Coun­ty asked the crowd, “Is there a law that states that it has to be grant­ed? If there’s a clean­er way to devel­op ener­gy, such as the Coal Riv­er Wind Project, should we not take advan­tage of it?”

Matt Louis-Rosen­berg point­ed out the absur­di­ty of the lit­ter­ing charges for the two indi­vid­u­als on the Brushy Fork Dam and the $2,000 bail for each of the pro­test­ers. He con­trast­ed the bail rate with the $1,800 fine Massey paid in 1999, when 14.5 miles of the Coal Riv­er were black­ened with slur­ry and the $15,000 A & G Coal paid for the death of three year old Jere­my David­son out­side of Appalachia, Vir­ginia in 2004.

“It was extreme­ly unjust that the mag­is­trate ille­gal­ly post­ed such a high bail, when our max­i­mum fine was only one hun­dred dol­lars,” said Lau­ra Steeple­ton of the Pet­tus 7, who was released this after­noon. “He jus­ti­fied his state­ment by telling us that we had no ties to the area. As a human being and a cit­i­zen of this coun­try I do not only have a tie to this area, but a respon­si­bil­i­ty to ensure secu­ri­ty for these moun­tains and the safe­ty for the peo­ple of this beau­ti­ful com­mu­ni­ty.”

Otaraua hapu save wahi tapu from oil pipeline in Aotearoa

28th May 2009
The Ota­raua hapu in Tarana­ki began pack­ing up their occu­pa­tion camp today after final­ly pro­tect­ing their wahi tapu, from Grey­mouth Petro­le­um’s new pipeline.

Greymouth occupation28th May 2009
The Ota­raua hapu in Tarana­ki began pack­ing up their occu­pa­tion camp today after final­ly pro­tect­ing their wahi tapu, from Grey­mouth Petro­le­um’s new pipeline.

After occu­py­ing the entrance to the well site and dis­rupt­ing work on the new well for more than two months, the hapu’s request to have Tiko­ran­gi Pa offi­cial­ly iden­ti­fied as a wahi tapu by the New Ply­mouth Dis­trict Coun­cil, was approved for an inde­pen­dent review last night.

After pre­vi­ous­ly demand­ing a writ­ten agree­ment from GMP, the hapu informed Grey­mouth Petro­le­um via fax yes­ter­day, stat­ing it was will­ing to accept a ver­bal state­ment by CEO Mark Dun­phy that GMP would not drill a pipeline through Tiko­ran­gi Pa. The hapu seem con­fi­dent that the Dis­trict Coun­cil review, due out in a few months, will pro­vide the pro­tec­tion they need for their pa.

Mr Door­bar said while the occu­pa­tion had brought the hapu togeth­er and clos­er to achiev­ing a com­mon goal, the fight was “not over”.

“It is impor­tant oil com­pa­nies who work in our com­mu­ni­ties under­stand the impact they have, not just on tan­ga­ta when­ua but on the wider farm­ing com­mu­ni­ty … for our­selves we feel we have achieved the out­comes of why we under­took this occu­pa­tion. Grey­mouth Petro­le­um did not drill through Tiko­ran­gi Pa. It remains to be seen whether or not we have to return to any form of peace­ful occu­pa­tion in the future.”

Updates: Day 11 | Day 17 | Day 55

Saving Iceland Summer Mobilisation 2009!

Join us from 18th July to resist the indus­tri­al­i­sa­tion of Europe’s last remain­ing great wilder­ness and take direct action against heavy indus­try!

The Strug­gle So Far

Join us from 18th July to resist the indus­tri­al­i­sa­tion of Europe’s last remain­ing great wilder­ness and take direct action against heavy indus­try!

The Strug­gle So Far

The cam­paign to defend Europe’s great­est remain­ing wilder­ness con­tin­ues. For the past four years direct action camps in Ice­land dur­ing the sum­mer have tar­get­ed alu­mini­um smelters, mega-dams and geot­her­mal pow­er plants.

After the ter­ri­ble destruc­tion caused at Kárah­n­júkar and Hengill, it is time to crush the ‘mas­ter plan’ that would have seen every sin­gle major glacial riv­er dammed, every sub­stan­tial geot­her­mal field exploit­ed and the con­struc­tion of alu­mini­um smelters, oil refiner­ies and sil­i­con fac­to­ries, as well as a sig­nif­i­cant increase in Iceland’s green­house gas emis­sions.

The Sit­u­a­tion Now

Despite opti­mism fol­low­ing the ‘cut­lery rev­o­lu­tion’ where mass street protests and direct action brought down the Ice­landic gov­ern­ment and forced the issue of heavy indus­try back onto the polit­i­cal agen­da, the bat­tle is far from over.

The fall of alu­mini­um prices on the world mar­ket and the glob­al eco­nom­ic cri­sis has tak­en its toll on heavy indus­try projects and alu­mini­um com­pa­nies in Ice­land, putting many of the plans for alu­mini­um smelters, mega-dams and geot­her­mal pow­er plants on hold, or ruled out com­plete­ly. The heavy indus­try machine is far from hav­ing been defeat­ed but recent upris­ings show the deep impact Sav­ing Ice­land has had on the grass­roots and the polit­i­cal land­scape.

Polit­i­cal Changes

The recent elec­tions are a major blow for the envi­ron­men­tal move­ment in Ice­land, with the ‘Left Greens’ boot­ing the min­is­ter of the envi­ron­ment out for being too much of a gen­uine envi­ron­men­tal­ist. We are look­ing at a heav­i­ly for­ti­fied pro-heavy indus­try gov­ern­ment, doing away with any pre­tence of the gov­ern­ment being ‘Green’ or even remote­ly Left wing. On top of this, nation­al ener­gy com­pa­nies have already start­ed nego­ti­a­tions with oth­er types of indus­try in the North, where some politi­cians ruled out a new smelter.

Anar­chy in Ice­land

Years of work by Sav­ing Ice­land to intro­duce the ideas of direct action and anar­chy into main­stream soci­ety, cou­pled with a rad­i­calised pop­u­la­tion fol­low­ing the down­fall of the gov­ern­ment, has result­ed in a con­stant­ly grow­ing move­ment of rad­i­cal activists and anar­chists in Ice­land.

Over the past few months squat­ters have twice tak­en a social cen­tre and defend­ed it from evic­tion, refugee and no bor­ders activism is going strong, Food Not Bombs hit the streets every week and actions such as the four “skyr attacks” (where green yoghurt is thrown all over dis­plays, com­put­ers and suits) in two months have tar­get­ed politi­cians and nature killers.

The mutu­al sup­port between the Ice­landic rad­i­cal com­mu­ni­ty and Sav­ing Ice­land this sum­mer will make for a very excit­ing and action-filled mobil­i­sa­tion!

Tar­gets this Sum­mer

The Hel­gu­vík alu­mini­um smelter, tar­get­ed by Sav­ing Ice­land last sum­mer with an action that stopped con­struc­tion for a whole day after 40 activists invad­ed the site, is still being built. Pow­er­ing the smelter will mean eight new pow­er plants, at least sev­en of which will be geot­her­mal from the Reyk­janes Penin­su­la, dry­ing it up, and Hell­isheiði – also tar­get­ed by Sav­ing Ice­land last sum­mer that saw a drill rig shut down cost­ing thou­sands of pounds. One of the geot­her­mal plants pow­er­ing Cen­tu­ry’s smelter could be in Bitra, close to Hengill, where a local cam­paign last win­ter stopped con­struc­tion from tak­ing place. The eighth pow­er plant will prob­a­bly be a mega-dam on the beau­ti­ful Þjórsá Riv­er.

If ever there was a build­ing site and “test drilling sites” destroy­ing unique and frag­ile ecosys­tems and vul­ner­a­ble to direct action this sum­mer they are on the Reyk­janes penin­su­la, South West Ice­land!

Get involved!

Come to Ice­land from the 18th July and join us for a sum­mer of resis­tance and direct action. Check www.savingiceland.org for reg­u­lar updates and infor­ma­tion for peo­ple join­ing us, or email us on savingiceland@riseup.net to let us know when you’re arriv­ing.

Help sup­port our strug­gle with dona­tions, trans­la­tions, sol­i­dar­i­ty actions and by spread­ing the word.