The Pirates of Broadhaven Defeat Shell’s Armada (& contractor’s addresses)

For the second time in three days a Shell dredger has been boarded and occupied by a Shell to Sea protester. As a result all the ships working in the bay have ceased work and returned to harbour. Reports confirm that work has been abandoned due to the action of the protesters!

Dredger occupation the second!For the second time in three days a Shell dredger has been boarded and occupied by a Shell to Sea protester. As a result all the ships working in the bay have ceased work and returned to harbour. Reports confirm that work has been abandoned due to the action of the protesters!

A group of 11 kayakers set out at 5:30am on Friday, meeting instant resistance on the water from Shell security boats and safety boats. After avoiding the Shell private security boats that were attempting to capsize the kayaks, one protester managed to board the dredger ‘Rezende Bol’ owned by Van Oord, who is subcontracted by Shell to do the dredging. This vessel along with another and multiple support and security boats were digging a trench in the seabed in preparation for the gas pipe-laying ship Solitaire. Work in the bay has been continuous 24 hours a day since Monday evening only stopping due to the previous dredger occupation by Shell to Sea protesters which lasted 10 hours. During the attempts to board the dredger several protesters were able to climb onto the side of the vessel. Excessive force was used to prevent them from boarding; one protester had his thumb bent backwards by a security guard and later was taken to the hospital where tests revealed damaged ligaments. Another protester who got on board the ship was violently pushed from the deck by two security guards injuring his back, and fell over six feet from the deck into the water. Shell security were kicking and stamping fingers of protesters on the near side of the vessel, all the while one protester managed to board the ship on the other side and climb up onto the same crane his friends had previously occupied just three days earlier.

The kayak support team prepared for similar shifts as Tuesday, anticipating a long-term occupation. Four kayakers remained on the water to keep an eye on the protester while the rest went in to regain energy. The reaction of the security and safety boats was very hostile, attempting to capsize kayaks and separate people from each other. The driver of the Galltee (Shell’s private security boat) repeated his threat to sink kayaks, driving extremely aggressively with no regard for the safety of the kayakers.

After the dredgers were towed away, the Garda arrived and boarded the ship in addition to the Shell security already on the ship. They threatened the protester on the crane arm with forced physical removal. Fearing for his own safety the protester jumped from the dredger arm onto the deck and dived into the water. The two supporting kayakers who were still in the water were arrested despite their efforts to comply with the Gardai’s instructions. In the water the crane protester managed to avoid capture by the Gardai and Shell security and get to the shore where he scaled a cliff to evade capture. His whereabouts are now unknown but he is safe and well!

Shell claimed that they stopped working in the bay due to a ‘swell’ but sources at Ballyglass pier confirmed that Van Oord, the subcontractor running the dredgers were unwilling to work with ongoing protest activity and the excessive use of force by the IRMS (Integrated Risk Management Services) .

Today’s actions are proof that resistance rocks!

Come to Mayo!

—-

Van Oord are involved as a main contractor on the Limerick Tunnel project, which they’re happy to tell you about on their website, but there’s no mention at all of their involvement with the Corrib Gas Project. Maybe their greenwash is important to them somehow, and maybe they don’t fancy negative publicity. Why don’t we give them some then, eh?

Van Oord’s website homepage:
http://www.vanoord.com/gb-en/index.php

Head office postal address for general mail:
Van Oord Dredging and Marine Contractors BV
PO Box 8574
3009 AN Rotterdam
The Netherlands

Visiting address:
Van Oord Dredging and Marine Contractors BV
Watermanweg 64
3067 GG Rotterdam
The Netherlands
T 31 10 447844
F 31 10 4478100
E info@vanoord.com

This is a contact for their ‘newsroom’, i.e. Media and PR:
A.G.M. (Bert) Groothuizen
Manager Marketing & Public Relations
T 31 10 4478234
F 31 10 4478100
E info@vanoord.com

On their ‘agenda’ page there is mention of this following event. Maybe they are keynote speakers at this conference, or that they will have a large trade exhibition presence there. Details from the conference website are sketchy, so more research is needed. There are other events for later in the year at which they’ll either attend or participate in, but I think the event at the end of this month may be a place where Van Oord can be shamed publicly about its involvement in Shell’s destruction of Broadhaven Bay.

The Flood and Coastal Risk Management Conference 2009 – 30 June 2009 – 02 July 2009
The International Centre, Telford, UK
(Telford is in Shropshire, west-central England, I think. Nearish to Birmingham anyway. The risks in coastal management must be enormous these days, if this conference has to be held in a place as far from the sea as you can get on the island of Britain!)
http://www.environment-agency.gov.uk/research/102626.aspx

Allseas are the company that own the Solitaire. The Solitaire is expected to arrive within the next month. It would be good if people could also put pressure on them before they get here:

http://www.allseas.com/uk

Allseas UK Limited
Address: Knyvett House The Causeway
City: Staines, Middlesex
Postcode: TW18 3BA
Telephone: +44 1784 898038
Fax: +44 1784 898030

Shell security breached and work stopped in successful action at sea

On Tuesday, after the afternoon confrontation in Broadhaven Bay which resulted in one man’s arrest and a couple hours of halted work for the dredgers, the Shell to Sea fleet of kayaks headed out on the water a second time around 6pm and two protesters managed to board one of the dredgers, climbing on to the neck of the c

Shell crane occupation in Broadhaven BayOn Tuesday, after the afternoon confrontation in Broadhaven Bay which resulted in one man’s arrest and a couple hours of halted work for the dredgers, the Shell to Sea fleet of kayaks headed out on the water a second time around 6pm and two protesters managed to board one of the dredgers, climbing on to the neck of the crane, occupying it and halting work for 10 hours.

Shell has been continuously dredging in the area since Monday evening, interfering with protected fishing areas for local fishermen, defiling what was once a pristine marine habitat full of dolphins, whales and other marine life, and disturbing sleep for local residents. They have buoyed off an ‘exclusion zone’ in the public waters, with boats patrolling the area to make sure no one crosses into it. There is a diverse assortment of vessels occupying the once pristine bay; the majority of these are either carrying out or assisting in the current dredging and surveillance operations. An Garda Siochana (police boat) have also been patrolling the work zone along with two black RIBs; The Laura Emily accompanied by its twin the Galltee, both brimming with men dressed in black military fatigues and video cameras for filming protesters. Other smaller motorboats accompanied the Shell crew, including ‘safety boats’ and a large white motor launch. There were tugboats for moving the dredgers, barges for holding the sand being removed from the seabed and, of course, the massive dredgers themselves.

A group of twelve Shell to Sea protesters in eight inflatable kayaks, two hard kayaks, and two rubber dingys set out on the water at 6pm for the second time in one day on Tuesday 2nd June. Three of the kayaks managed to evade the security boats and get close enough to board one of the dredgers. One protester began to climb the ladder from her boat while another kayaker blocked a security boat from grabbing her. The other protester used the tires on the side of the dredger to board the deck. Once on the boat, both protesters were climbing onto the crane within seconds. They slid down into the neck of the crane making it impossible for the crew to remove them.

Loud cheers were heard from ashore where people were gathered at the Rossport Solidarity Camp, and the mood on the water was extremely positive. ‘Shell to hell’ chants were abounding, and there were even some playful exchanges between Shell to Sea kayakers and a couple of motorboats. There were varying attitudes on different boats, but not all of the gardai or safety boats were unfriendly. Both inflatable kayaks which had been left in the water where the two protesters had boarded the dredger were quickly recovered. One was towed out of the ‘exclusion zone’ by a Shell to Sea protester, and one was brought on board the gardai boat and placed back in the water outside of the exclusion zone. The rest of the Shell to Sea kayakers remained on the water to ensure the protesters were not going to be dangerously removed, then began taking shifts to stay close to them and provide support.

In a surprisingly honest conversation between the kayak protesters and a worker on one of the boats, the worker stated that he ‘admired the persistence’ of the local community and supporters who are resisting the pipeline. He also said he thought the pipeline plan was ‘relatively safe’ and asserted that sometimes risks have to be taken. Unfortunately with a kill zone of up to 200 meters and the uncertainty of never having built such a high pressure pipeline through a residential area, the risk is high. This is why resistance to the pipeline is so strong; as one of the two protesters who occupied the dredger later stated, “Today we took this action in solidarity with the local community and to try to protect this beautiful area from being ravaged by Shell.”

The rotating shifts of support continued on through the night, with small groups of kayakers keeping an eye on their friends long after the gardai had left around 12am. Once it was dark and the gardai had left, the mood at sea changed. The Shell security and the safety boat for the dredger were the only ones left. The Shell security RIBs became increasingly aggressive towards the kayakers. They made multiple attempts to capsize them, and used intimidation techniques such as turning their lights off until they were up close then suddenly shining floodlights, disorienting and frightening them. One of the kayak crew reported feeling seriously concerned that the situation would escalate. A security guard even stated his intention was to sink the boats, a plausible threat given the recent vicious attack by IRMS on Willie Corduff. It was reported that the ‘safety boat’ also seemed concerned for the safety of the kayakers, and may have been their only protection in the situation.

By 4am, the two protesters on the dredger were feeling very cold and tired, and felt as if they had achieved a significant victory. They voluntarily climbed down from the crane, and were illegally detained by IRMS security and brought to Ballyglass pier where they were arrested and charged with loitering in a public place.

Despite the severe difficulties encountered throughout the night the mood across the camp from the kayaking teams and all the support crews was jubilant. Having breached Shell’s security and made such a significant stop to dredging work people at the solidarity camp remain in a defiant mood: watch this space for more resistance to the devastation at sea and on the land.

Peru Indigenous Holding Strong in Standoff

June 3rd 2009
A massive indigenous mobilization in the Peruvian Amazon is nearing its second month, with no sign that the native protesters will allow themselves to be intimidated into giving up on their demands.

Peru oil boat occupationJune 3rd 2009
A massive indigenous mobilization in the Peruvian Amazon is nearing its second month, with no sign that the native protesters will allow themselves to be intimidated into giving up on their demands.

Thousands of indigenous protesters have blockaded critical infrastructure in Peru’s Amazon region since April 9, when they declared a national strike in protest of new laws that would facilitate increased industrial exploitation of their territories for timber, oil and gas. The laws were passed by decree under powers granted to President Alan Garcia to bring to country into compliance with a US-Peru free trade agreement. The 10 laws that protesters are demanding repealed were not part of the trade agreement, however, and were declared unconstitutional by a congressional commission in December.

So far, indigenous protesters have blockaded roads and waterways, forced a shutdown to the only crude oil pipeline in Peru, forced two oil companies to cease operation, blocked tourist access to the ruins of Machu Picchu (twice), and held protests that paralyzed the region’s biggest city, Iquitos. On May 31, several hundred protesters took over two valve stations on the only pipeline that transports natural gas from the controversial Camisea gas fields.

The protests are organized under the auspices of the Interethnic Development Association of the Peruvian Rainforest (AIDESP), which represents 1,200 different native communities. AIDESP’s elected leader, Alberto Pizango, insists that the mobilization will not end until Congress repeals the 10 objectionable laws, declares the state of emergency (martial law) declared in 5 Amazonian provinces since May 9, and enters a good-faith discussion with native communities over a different model for developing the Amazon.

One of the 10 laws has been tentatively repealed, but this action must be approved by the full Congress. The other 9 laws remain on the books.

Anti-Shell actions at Rossport, Eire

2nd June 2009

Rossport: Causeway at Shell compound ‘washed away’ by Shell to Sea action

2nd June 2009
Removing Shell's causeway at Glengad
Rossport: Causeway at Shell compound ‘washed away’ by Shell to Sea action

Part of the Shell causeway extending into the sea at Glengad was yesterday evening removed by Shell to Sea protesters. This was in protest at the illegal blocking of access to the public beach and to oppose the forcing of this unsafe project on the local community and the giveaway of Ireland’s natural resources.

A group of about 30-40 people waded into the sea to gain access to the causeway, and proceeded to remove a large amount of the stone which makes it up. They were confronted by a 70 Shell security after about half an hour of the action, at which point the people left. An upbeat and playful mood prevailed over a beautiful evening.

The Rossport Solidarity Camp has again taken up residence in Glengad, and after a very successful weekend, including a number of actions, will build up the resistance to Shell over the coming weeks and months.

—-
Anti-Shell inflatable protest
Monday the 1st of June saw the arrival of a multitude of assorted vessels to Broadhaven bay. The boats, which are subcontracted by The Royal Dutch Shell company (Shell), are attempting to prepare for works on the controversial Corrib gas project.

Today however, their progress has been significantly impaired by resident Shell to Sea activists that had already gathered a small, albeit formidable, fleet of kayaks, ready to deploy within short notice. The Kayaks were birthed from the Rossport Solidarity Camp, which directly overlooks the vicinity that the Shell boats have been operating in the past twenty-four hours.

Currently there are diverse assortments of vessels converging in the once pristine bay; the majority of these are either carrying out, or assisting, dredging and surveillance operations. An Garda Siochana, have also been sighted patrolling the work zone, along with two black ribs; The Laura Emily accompanied by its twin the Galltee, which are both brimming with men dressed in black military fatigues.

Works, taking place earlier this afternoon, came grinding to a complete halt when twelve activists in kayaks broke through the security line that consisted of nine high speed security boats. The activists managed to tactfully circumnavigate security boats for approximately two and a half hours, which effectively halted Shell dredging works for a considerable period of time.

After numerous attempts by Gardai to secure an arrest, they eventually managed to drag one man from his inflatable Kayak. The man, in his fifties, is reported to have been halting a dredger conveying silt into a barge, and thus stopping afternoon work.

This current work being carried out by Shell is likely to signify the impeding arrival of the Solitaire; at over 400 meters long the Solitaire is the largest pipe laying vessel in the world, and its expected presence in Co. Mayo will undoubtedly provoke formidable resistance.

At this point in the project, all dredging works carried out in Rossport are likely to be held as sacrosanct by Shell’s board of directors, and conversely seen as detrimental by the Irish public.

South American dam news

2 Arrests in Home Depot Dam Protest; Take Action!

May 27th, 2009

2 Arrests in Home Depot Dam Protest; Take Action!

May 27th, 2009
Two activists were arrested at a Home Depot in Glendale, CO, near Denver, after hanging a banner off the building that read, “Dam Home Depot, NOT Patagonia!” Home Depot is under pressure from International Rivers and allies for its ongoing financial involvement with the main Chilean interest promoting 5 dams in Chilean Patagonia.

Home Depot has a shareholders’ meeting coming up on Thursday, May 28 in Atlanta, Georgia. Contact them (before their May 28 shareholders’ meeting if possible, but certainly during or after as well) and tell them to cancel purchases of timber from the Matte and Angelini Groups (the companies CMPC and Arauco) for their involvement in plans to dam wild Patagonia, and to drop the charges against Earth First! protesters in Arapahoe County, Colorado. Call 1-800-553-3199 (press extension # 5), or send an email directly from this site.

For more background on the issue, visit International Rivers’ Patagonia page.

More South American Dam News

Chilean Patagonia: International Rivers deployed two large banners at Home Depot’s annual shareholder meeting in Atlanta, GA, USA, on May 28, demanding that the corporation sever ties with the two companies pushing plans to dam 5 rivers in wild Patagonia. Inside the meeting, protesters brought their demands directly to the company’s board.

The action came only a day after 2 Earth First! activists were arrested for dropping a similar banner off a Home Depot in Colorado. For more information on the campaign to Dam Home Depot and Save Patagonia, visit International Rivers’ Patagonia page.

Brazil: At least 7 people were killed when a water storage dam burst, flooding the city of Cocal da Estação, population 30,000. Thousands were left homeless or without electricity. Following the accident, a Brazilian dam expert estimated that 200 other dams in the country are at risk of failure.

In better news, a federal judge has suspended the environmental permit for the Belo Monte dam on the Xingu river, due to insufficient consideration of the effects on indigenous people. The Xingu dams have drawn a great deal of opposition on both legal grounds and from indigenous nations whose territory would be flooded or degraded if they go through. They are part of a much larger plan to scale up Brazil’s energy infrastructure through the construction of massive hydroelectric and nuclear plants.

Peru: The Central Ashaninka del Rio Ene (CARE), representative of the indigenous Ashaninka communities of the Ene Valley, declared its unequivocal opposition to the planned Pakitzapango hydroelectric dam stating, that “the Ashaninka communities of the Ene river … Repudiate the use of the Ashaninka word Pakitzapango in light of its spiritual and cultural significance for the Ashaninka People of Peru [and] Demand that any activity such as research, promotions, reports, meetings or proposals that support or promote the construction of the Pakitzapango dam are immediately called off. The Ashaninka of the Ene valley will NOT permit the entry of any institution carrying out any of the mentioned activities.”

Read the full declaration.

UPDATE (June 4 2009): It appears that the dams planned for Ashaninka terriotry in Peru are intended to sell electricity to Brazil, primarily for mining, metal processing and industrial agriculture industries in the Eastern Amazon.

Eco-VIllage Occupation London 6th June Update + Other News.

Hello friends,

In this report:

News of the upcoming Eco-Village occupation taking place on a disused piece of land near Hammersmith starting on Saturday, 6th June (see attached e-flyer for details).

Eco flyerHello friends,

In this report:

News of the upcoming Eco-Village occupation taking place on a disused piece of land near Hammersmith starting on Saturday, 6th June (see attached e-flyer for details).

The latest from the Tyting community farm occupation <--- information on how you can get involved and support the action.

And some interesting facts about the land in Britain.

ECO-VILLAGE OCCUPATION

The Eco village occupation begins on the 6th June. Meet at Waterloo Station at 10AM under the clock. Please try to be on time.

********Please Note**********

If you are coming for the opening stage of the eco-village occupation, you will need to bring a tent, water and food supplies. If you have access to kitchen equipment and other useful tat that you would be OK to loan, please bring it along too.

***************************

The Eco-Village Occupation is about to begin. Infinite possibilities lie ahead; what will happen depends on what we make it. By creating a sustainable community in the heart of the urban jungle, we have an opportunity to raise the consciousness of urban dwellers all around and shine a light on a way of living that goes far to solving the problem of the destruction of people and planet.

During the last public planning meeting, we had consensus on the following issues:

– A no vehicle on site policy. In order to maximize living space and encourage people to come to the village via sustainable means.

– Acoustic music only. So that we don’t make enemies of the neighbours.

– All major decisions in the eco-village to be decided via the consensual decision making of all the people in the eco-village.

Please come along and join us. Ideally, we are looking for committed people who share in the vision of the eco-village community and who are able to commit for an indefinite period, however if you simply want to stay for a night or two or even visit for a day, please feel free to come along.

This eco-village occupation is inspired by The Land is Ours which campaigns peacefully for access to the land, its resources, and the decision-making processes affecting them, for everyone, irrespective of race, gender or age. for more information, please visit:

www.tlio.org.uk

contact Carolyn on: 01727 812369 or Gareth on: 07515 166011 or

diggers360@yahoo.co.uk

Tyting Community Farm Occupation.

Six weeks ago a group of people (some fresh from the Raven’s Ait occupation in Kingston) asserting their common law right to live and grow food, commenced the occupation of Tyting Community Farm in Half Penny Lane Guildford. (a publicly owned site which has been vacant for several years).

Guildford council (the owner of the property) has been trying without success and with much local opposition to sell the community farm off by dividing it into smaller lots.

The council were granted an ‘interim possession order’ last Wednesday (27th May) and threatened to send in the police to remove anyone still on the site. On Friday morning, various contractors arrived and boarded up the farmhouse (but no police).

Far from denting their morale, the threat of forceful eviction has simply made those enjoying life at the farm more determined to stay their ground.

To see a video of what’s been happening at the farm please click here: http://www.youtube.com/watch?v=PKe_uCHpokU

This occupation is open to anyone who would like to be part of the community, grow vegetables and live in a sustainable way, whilst helping to retain common rights to a valuable and beautiful piece of common land. If you want to get involved, simply grab a tent and some food (plus some seeds if you have them) and come along. Here is a map of the location of the farm.

Facts about the land in Britain

did you know that….

In Britain 70% of land is still owned by less than 1% of the population
Less than 8% of the country is under concrete
50% of the land in England and Wales remains unregistered
the Church of England has ‘mislaid’ 1.5 million acres it owned 100 years ago
the Royal Family now own or control the equivalent of an average-sized county in England.

* information courtesy of www.who-owns-britain.com

Shell compound breached in Glengad during RSC gathering

May 31, 2009
This afternoon at 5pm, over 200 people from the local community and the Rossport Solidarity Camp Summer Gathering attempted to dismantle Shell’s illegal compound at Glengad.

Trying to breach Shell compound at GlengadMay 31, 2009
This afternoon at 5pm, over 200 people from the local community and the Rossport Solidarity Camp Summer Gathering attempted to dismantle Shell’s illegal compound at Glengad.

After a day of direct action training, local people and their supporters walked to the south side of the compound where they attempted to breach the fence in two places. They were met by strong opposition from over sixty Gardai, including many from the Public Order Unit.

At least five people who scaled the fence into the compound were held by security guards and later arrested.

Later in the afternoon, as the crowd were leaving, a further arrest was made when the Gardai targeted a prominent campaigner and forcibly detained him for speaking out against the actions of the Gardai.

Today’s action comes the day after Maura Harrington was released after 13 days in Mount Joy prison, Dublin for non-payment of fines, including a one thousand euro contribution to the Garda Benevolent Fund.

Around 200 people are attending the RSC summer gathering. It’s a beautifully sunny weekend and preperations are now well under way for another summer of action against Shell in Mayo, on land and sea. Come and be part of it!

More Arrests on Coal River Valley as Actions Against Mountaintop Removal and Coal Sludge Dams Continue

Non-violent Civil Disobedience in Coal River Valley, WV: Seventeen Arrested in Three Separate Actions

Non-violent Civil Disobedience in Coal River Valley, WV: Seventeen Arrested in Three Separate Actions

May 23, 2009: Coal River Valley, WV More than seventy-five residents of the Coal River Valley and members of a coalition that includes Mountain Justice and Climate Ground Zero picketed the entrance to Massey Energy’s Marfork mining complex today at noon. Seven people were arrested. The actions were in protest of the company’s plans to blast 100 feet away from the Brushy Fork coal sludge impoundment.

The demonstration began with a prayer and sermon by Bob “Sage” Russo of Christians for the Mountains. Referencing the Sermon on the Mount, he called upon citizens to be stewards of the Earth and to move towards sustainable, stable jobs.

Protestors stood in front of the gates of the mine facility with signs including “7 billion spilled, 998 killed.”

“Passersby on Route 3 were overwhelming supportive with honks, waves, and thumbs up signs,” Rock Creek (Raleigh County) resident Julia Sendor said.

During the protest, seven people approached the entrance to the dam facility and the Whitesville detachment of the West Virginia State Police asked them to leave. When the seven refused, the State Police arrested them. Dispatchers say the activists were sent to the Southern Regional Jail near Beckley, but that information has not been confirmed. Bail was reportedly set at $2,000 per person.

After the arrests, former U.S. Congressman Ken Hechler, a longtime opponent of strip mining, gave a speech. He underscored the responsibility of citizens to safeguard their freedoms and stand up for their rights.

The protest came just hours after activists carried out two non-violent direct actions to protest mountaintop removal and coal sludge impoundments.

This morning, at the Marfork facility, two people wearing hazmat suits and respirators were arrested after boating onto the Brushy Fork impoundment and floating a banner that read, “No More Toxic Sludge.” State Police charged the activists with littering and misdemeanor trespass and transported them to the Southern Regional Jail. Their bail has been set at $2,000.

At another action, six activists hung a “Never Again” banner and chained themselves to a massive dump truck on a Patriot Coal-owned mountaintop removal mine on Kayford Mountain. State Police arrived on site to find three people chained to the main axle of the truck and three others chained outside the truck’s cab. The police removed the six activists, who, along with two others supporting them, were transported to the Madison County Courthouse, where they were reportedly processed and released.

The toxic lake at Brushy Fork dam sits atop a honeycomb of abandoned underground mines. Massey Energy’s own filings with the state Department of Environmental Protection project a minimum death toll of 998 should the seven-billion-gallon dam break. Floodwaters would reach 38.78 feet in height in the town of Peytona, 26.61 miles downstream, within three hours and fifteen minutes of breakage.

—–

May 26, 2009: BECKLEY, W.Va. – Seventeen mountaintop removal activists had no choice but to enforce the laws since all administrative remedies have been exhausted, said some of the activists and supporters at a press conference today. The four still-jailed activists were released on their own recognizance by Judge Burnside shortly after the press conference, which was held on the Raleigh County Courthouse steps.

“I’ve lived in West Virginia most of my life. I’m sick and tired of big business and the corrupt government telling us what to do,” began Sid Moye of Mercer County, who participated in the Picket at Pettus. “They come in and they can take our land, they can ruin our water and they can take our resources. It’s not right and somebody has to do something about it so we do the little things that we can.”

Eric Blevins, also arrested in the Pettus action, said, “I asked the officer arresting me if Massey is going to be allowed to blast near the dam and he didn’t want to talk about it. I asked him, doesn’t he have a responsibility to enforce the law, and he said ‘Not those laws.'”

“We locked down on the Kayford mountaintop removal site with mud from Mingo County on our boots,” Ashlee Henderson said in a statement from the Kayford 8, “After we were arrested we had the dust remains from Kayford Mountain added to that mud.”

“Just because a mining permit is applied for,” Debbie Jarrell of Rock Creek, Raleigh County asked the crowd, “Is there a law that states that it has to be granted? If there’s a cleaner way to develop energy, such as the Coal River Wind Project, should we not take advantage of it?”

Matt Louis-Rosenberg pointed out the absurdity of the littering charges for the two individuals on the Brushy Fork Dam and the $2,000 bail for each of the protesters. He contrasted the bail rate with the $1,800 fine Massey paid in 1999, when 14.5 miles of the Coal River were blackened with slurry and the $15,000 A & G Coal paid for the death of three year old Jeremy Davidson outside of Appalachia, Virginia in 2004.

“It was extremely unjust that the magistrate illegally posted such a high bail, when our maximum fine was only one hundred dollars,” said Laura Steepleton of the Pettus 7, who was released this afternoon. “He justified his statement by telling us that we had no ties to the area. As a human being and a citizen of this country I do not only have a tie to this area, but a responsibility to ensure security for these mountains and the safety for the people of this beautiful community.”

Otaraua hapu save wahi tapu from oil pipeline in Aotearoa

28th May 2009
The Otaraua hapu in Taranaki began packing up their occupation camp today after finally protecting their wahi tapu, from Greymouth Petroleum’s new pipeline.

Greymouth occupation28th May 2009
The Otaraua hapu in Taranaki began packing up their occupation camp today after finally protecting their wahi tapu, from Greymouth Petroleum’s new pipeline.

After occupying the entrance to the well site and disrupting work on the new well for more than two months, the hapu’s request to have Tikorangi Pa officially identified as a wahi tapu by the New Plymouth District Council, was approved for an independent review last night.

After previously demanding a written agreement from GMP, the hapu informed Greymouth Petroleum via fax yesterday, stating it was willing to accept a verbal statement by CEO Mark Dunphy that GMP would not drill a pipeline through Tikorangi Pa. The hapu seem confident that the District Council review, due out in a few months, will provide the protection they need for their pa.

Mr Doorbar said while the occupation had brought the hapu together and closer to achieving a common goal, the fight was “not over”.

“It is important oil companies who work in our communities understand the impact they have, not just on tangata whenua but on the wider farming community … for ourselves we feel we have achieved the outcomes of why we undertook this occupation. Greymouth Petroleum did not drill through Tikorangi Pa. It remains to be seen whether or not we have to return to any form of peaceful occupation in the future.”

Updates: Day 11 | Day 17 | Day 55

Saving Iceland Summer Mobilisation 2009!

Join us from 18th July to resist the industrialisation of Europe’s last remaining great wilderness and take direct action against heavy industry!

The Struggle So Far

Join us from 18th July to resist the industrialisation of Europe’s last remaining great wilderness and take direct action against heavy industry!

The Struggle So Far

The campaign to defend Europe’s greatest remaining wilderness continues. For the past four years direct action camps in Iceland during the summer have targeted aluminium smelters, mega-dams and geothermal power plants.

After the terrible destruction caused at Kárahnjúkar and Hengill, it is time to crush the ‘master plan’ that would have seen every single major glacial river dammed, every substantial geothermal field exploited and the construction of aluminium smelters, oil refineries and silicon factories, as well as a significant increase in Iceland’s greenhouse gas emissions.

The Situation Now

Despite optimism following the ‘cutlery revolution’ where mass street protests and direct action brought down the Icelandic government and forced the issue of heavy industry back onto the political agenda, the battle is far from over.

The fall of aluminium prices on the world market and the global economic crisis has taken its toll on heavy industry projects and aluminium companies in Iceland, putting many of the plans for aluminium smelters, mega-dams and geothermal power plants on hold, or ruled out completely. The heavy industry machine is far from having been defeated but recent uprisings show the deep impact Saving Iceland has had on the grassroots and the political landscape.

Political Changes

The recent elections are a major blow for the environmental movement in Iceland, with the ‘Left Greens’ booting the minister of the environment out for being too much of a genuine environmentalist. We are looking at a heavily fortified pro-heavy industry government, doing away with any pretence of the government being ‘Green’ or even remotely Left wing. On top of this, national energy companies have already started negotiations with other types of industry in the North, where some politicians ruled out a new smelter.

Anarchy in Iceland

Years of work by Saving Iceland to introduce the ideas of direct action and anarchy into mainstream society, coupled with a radicalised population following the downfall of the government, has resulted in a constantly growing movement of radical activists and anarchists in Iceland.

Over the past few months squatters have twice taken a social centre and defended it from eviction, refugee and no borders activism is going strong, Food Not Bombs hit the streets every week and actions such as the four “skyr attacks” (where green yoghurt is thrown all over displays, computers and suits) in two months have targeted politicians and nature killers.

The mutual support between the Icelandic radical community and Saving Iceland this summer will make for a very exciting and action-filled mobilisation!

Targets this Summer

The Helguvík aluminium smelter, targeted by Saving Iceland last summer with an action that stopped construction for a whole day after 40 activists invaded the site, is still being built. Powering the smelter will mean eight new power plants, at least seven of which will be geothermal from the Reykjanes Peninsula, drying it up, and Hellisheiði – also targeted by Saving Iceland last summer that saw a drill rig shut down costing thousands of pounds. One of the geothermal plants powering Century’s smelter could be in Bitra, close to Hengill, where a local campaign last winter stopped construction from taking place. The eighth power plant will probably be a mega-dam on the beautiful Þjórsá River.

If ever there was a building site and "test drilling sites" destroying unique and fragile ecosystems and vulnerable to direct action this summer they are on the Reykjanes peninsula, South West Iceland!

Get involved!

Come to Iceland from the 18th July and join us for a summer of resistance and direct action. Check www.savingiceland.org for regular updates and information for people joining us, or email us on savingiceland@riseup.net to let us know when you’re arriving.

Help support our struggle with donations, translations, solidarity actions and by spreading the word.