Idaho Residents Arrested Blocking Tar Sands Megaloads Bound for Alberta

26.8.11

They spill, they drill and we fight back with the only currency we have—our bodies, our minds and a fighting spirit.

26.8.11

They spill, they drill and we fight back with the only currency we have—our bodies, our minds and a fighting spirit.

Hundreds have been arrested sitting in at the White House this week and Alberta’s Indigenous communities have been fighting Big Oil’s development of tar sands for quite some time , but today residents in Moscow Idaho crossed a line of their own.

Last night in the wee hours of the morning, as the first megaloads were beginning to roll, four men and women with Wild Idaho Rising Tide sat down in front of the massive vehicles to stop their passage through the highways and byways of the Northern Rockies to Alberta.

Moscow resident Brett Haverstick said- “Big Oil intends to clear-cut and strip mine a place the size of Florida, and simultaneously destroys native communities and entire watersheds. I feel obligated to speak up and say this is wrong.”

This morning’s action is part of a larger campaign being waged in Idaho and Montana by communities and environmentalists to stop the passage of tar sands heavy haul trucks through their region.

Activists Arrested For Blocking Tar Sands “Megaload” on US 95

Citizens Stand In Solidarity with Canadian First Nations & Others In Opposition to Extraction of the Alberta Tar Sands and the Building of the Keystone XL Pipeline

Moscow, ID- Early Friday morning, a group of Moscow residents were arrested for sitting in the road and blocking US 95 to protest an Exxon/Imperial Oil “megaload” shipment destined for the Alberta Tar Sands. In an act of non-violent, civil-disobedience, men and women sat down in the crosswalk of the highway when the four-hundred-thousand pound, two-hundred foot long, twenty-four foot wide, and fourteen-foot tall oil-processing module entered the downtown area. In a showing of solidarity with the First Nations people of Canada, and the hundreds of people getting arrested in Washington, D.C., the individuals are calling for the Obama Administration to deny permits for construction of the Keystone XL Pipeline, which would stretch from Alberta, Canada to the Gulf of Mexico.

“Not only are people calling the Alberta Tar Sands the most unsustainable and destructive project on the planet, but also an act of genocide against the people that live in the region, particularly those down-stream of the tailing ponds,” said Moscow resident Brett Haverstick. “Big Oil intends to clear-cut and strip mine a place the size of Florida, and simultaneously destroys native communities and entire watersheds. I feel obligated to speak up and say this is wrong.”

With the Obama Administration getting ready to make a decision on the Keystone XL Pipeline later this year, the individuals said they have been inspired by the hundreds of people getting arrested in Washington D.C. this past week in protest of the Keystone XL Pipeline.

“President Obama must deny permits for the Keystone XL Pipeline. Go ask the people of Montana or the people of Michigan if they want more oil pipelines built across their lands and waterways, said Moscow resident Greg Freistadt. “People are traveling from Nebraska all the way to Washington, D.C. and getting arrested this week because the pipeline threatens their drinking water and livelihoods. It’s time for communities to come together and oppose this.”

The possible construction of the Keystone XL Pipeline isn’t the only oil pipeline that concerns the activists. The Northern Gateway Pipeline is scheduled to be built west from Alberta, Canada to the Pacific Ocean so that crude oil can be shipped to China and India.

“The First Nations people unanimously oppose this pipeline across their lands,” said Moscow resident Vince Murray. “In addition, supertankers plying the pristine coastline of northern British Columbia would endanger one of the last unspoiled ocean ecosystems in the world.”

The individuals have also been extremely disappointed with their city and state elected officials.

“Megaloads are terrorizing our highways in the Northern Rockies, pipelines are spilling oil into some of our most precious rivers, and our governors and Congressional leaders will not come to our defense, said Moscow resident Diana Armstrong. If leaders won’t lead, then it’s up to us to step forward.”

Rossport round-up: come fight Shell with us

Day of Chaos against Shell at Aghoos Compound
23.08.2011
A mass trespass stops work, one person on top of a digger for 4 hours

Day of Chaos against Shell at Aghoos Compound
23.08.2011
A mass trespass stops work, one person on top of a digger for 4 hours

Today 25 people from Rossport Solidarity Camp sustained a barrage of actions against the site Shell is preparing for its tunnel boring machine. Despite 80 security and three vans of gardaí they were unable to keeps the protesters out. In the chaos that ensued one person got through the lines to d-lock themselves to one of the diggers and remained up there stopping work for 4 hours. Elsewhere other diggers had to stop working as protestors approached.

Con Coughlan, one of those who one of those who breached security said, “It was an incredible day. We pushed and pushed. No matter how many times they dragged us out we kept going back. People were coming from the back, others were launching themselves over the fences at the front.”

The day started at 2pm with three separate groups coming from different directions. From early on they began being carried out of the compound by private security, but this was no deterrent with people simply dusting themselves off and going back around. Despite their much greater numbers, security struggled to keep up with the constant pressure. Numerous weaknesses in the site perimeter were found and used to keep people coming in.

It was in a moment of chaos that one person found the opportunity to slip under a fence and made the dash for the nearest digger. Security, caught on the hop, despite holding off a number of other protesters, failed to stop her getting on top and using a d-lock she had brought with her to attach her neck to the roof section. She then settled down for a nap while the rest got on with the day. She was there for four hours and was not arrested.

Most of the work going on was to build the palisade fencing for the inner compound of the site. This is being supplied and installed by Shevlins Engineering.

Grainne Bradaigh , another of those who found a way in said, “We had fun. It was really very empowering. You could see how effective we were being from the way the workers were so frustrated. It was the first time I’ve done something like this, but I’m definitely up for it again. The gardaí were outside acting as private security for the tractors coming in, but there was nothing they could to do to stop us inside Shell’s compound.”

Actions have been taking place against Shell in co. Mayo all summer, opposing the construction of a pipeline that will pump high pressure gas through the beautiful Broadhaven Bay. It is part of a broader campaign by locals and those who support their efforts, that has been going on for ten years. Since May a camp has been established above the important site at Aughoose. It is open to all – if you are interested in coming along, please visit the website at www.rossportsolidaritycamp.org

—–
Double Barrel Concrete Lock-on Stops Shell

Monday 22nd August at 6am, two people locked their arms into concrete barrels in the road between Shell’s Ballinaboy refinery and the tunneling compound in Aughoose. The lock-on lasted for 7 hours, stopping all deliveries to the compound during that time.

Currently Shell are trying to set up a compound in Aughoose, 3km from the refinery at Ballinaboy. They are bringing in fencing, bogmats, steel girders and other equipment in order to secure the compound. Once it is secure Shell intends to remove 75,000 tonnes of peat from the bog. This bog is an important wetland habitat, home to frogs and newts and loads of diverse flora and fauna. After removing the peat they plan on bringing in the tunnel boring machine and begin the tunnel under the estuary for the onshore pipeline.

The concrete lock-ons were set up at 6am on Monday. As Shell normally begins deliveries to the compound from 7am, this 7 hour lock-on effectively stopped all deliveries for 6 hours.

The Garda cutting team which specialises in cutting protesters out of lock-ons and getting people down from high places, did not arrive until 9am. The first person was cut out of the first concrete barrel just before 11am. Within 15 minutes they began cutting the second concrete barrel to remove the second person. The second person was cut out just before 1pm, at which point the guards called Mayo County Council to clean up the mess of the cut up lock-on.

Local residents and the Rossport Solidarity Camp are doing continuous actions against Shell. If you’ve been meaning to come but just haven’t gotten around to it yet, come for a visit. There is plenty to do here including gardening, cooking, site maintenance, talking to locals or writing indymedia articles, as well as sitting in a lock-on if you like that kinda thing. The only way to really understand what is happening here is to come and see for yourself. The camp is located in a field in Aughoose overlooking the Shell compound, between Pullathomas and Ballinaboy.

To contact the camp, ring 085 114 1170 or email rossportsolidaritycamp[at]gmail[dot]com
http://shelltosea.com

—–

Gardaí and Shell Security Work Hand in Hand Blocking Public Roads

An Garda Siochana and Integrated Risk Management Services (IRMS) policing the roads together

Monday 15th August at 9am a group of 12 people went down to Shell’s compound in Aughoose to stop work. Eventually Shell’s private security (IRMS) and the Gardaí began working together to police the roads and protect deliveries of equipment to the compound.

After about an hour of protesters maintaining a presence on the road and slowing the work of the diggers, Gardaí and IRMS formed a line containing protesters on the opposite side of the road from Shell’s compound. The private security have absolutely no jurisdiction on a public road, so they have no right to be containing and handling people.

At one point an IRMS manager gave orders to the Gardaí, telling them to back off and allow traffic to pass. Several cars were held up for at least 15 minutes while Shell delivered a new digger to the compound. In Shell’s traffic management plan it states that the public road will remain open at all times, however in the past few weeks we have seen IRMS closing the public road for up to 30 minutes at a time.

On Tuesday 16th August a group of people went down to the compound again to stop the work, this time entering the compound from around the side. Some people were carried or escorted by IRMS up to the public road, no arrests were made.

The protests are continuous, and people are needed to sustain actions. If you are thinking of visiting the camp, any time is a good time. The camp is located in a field opposite the Shell compound in Aughoose, between Ballinaboy and Pullathomas.

To contact the camp, ring 085 114 1170 or email rossportsolidaritycamp[at]gmail[dot]com

—–

Some Expert Lorry Climbing Stops Shell

Between a mass trespass in the morning, someone blocking the road for 2 and ½ hours by climbing on top of a lorry, and a protest outside Shell’s Ballinaboy refinery, Thursday 11th August was a day full of blocking Shell.

Thursday 11th August at 10:30am about 20 people entered the compound in Aughoose which Shell is expanding in order to build the tunnel for the onshore pipeline. The diggers which are laying bogmats and erecting fencing retreated into the centre of the compound which is heavily guarded by IRMS, Shell’s private security force. Work was slowed for an hour and a half while people were on the site.

At 11:30am someone managed to climb on top of a lorry which was about to deliver fencing and girders to the compound. The halted lorry blocked the road so they were not able to bring anything else into the compound. Shell estimated they would be making 75 deliveries per day, today they managed about 10.

Just before 2pm the Garda public order unit showed up with their new toy, a cherrypicker. Sergeant Butler was driving it, and three public order Gardaí went up in the cage and pulled the person off of the steel girder he was sat on.

Once the road was cleared a few people went back down onto the compound and once again the diggers retreated and stopped working for about an hour.

To finish up the day, a group of people cycled to Shell’s Ballinaboy refinery for 6pm and stopped the last few tractors of the day from coming out, simply by sitting outside the gates and making tea. Then on the way home the cyclists delayed the IRMS shift change for almost an hour, until the Gardaí arrived and the cyclists went home for dinner.

—–

Corrib Gas protest at Aughoose compound

At approx 6.40 am this morning, Wednesday 9th August, members of Rossport Solidarity Camp entered Shell’s pipe laying compound at Aughoose. Shell is attempting to extend its existing compound to facilitate the arrival of its tunnel boring machine. A total of about 70 I-RMS security guards removed 10+ protesters from the compound with force. Gardai were standing by to assist the I-RMS, however, they were faced with a difficult legal predicament: which law could they use to restrain or arrest a protester? Without the free reign of “public order” legislation, the Gardai could only reproach protesters if the private land owner, Shell, requested it.

One protester was arrested for refusing to give a name and address. Gardai are entitled to request a name and address only if the person in question is, within reason, suspected of breaking a law. In short, a garda must tell a person why he/she is requesting a name and address. The gardai were having difficulty locating such a reason. It is unclear whether or not Shell asked the Gardai to intervene. With the negative public relations image Shell has acquired for itself in Ireland due to the Corrib project, it is thought that Shell are reluctant take any court proceedings against protesters.

The IRMS was policing the entire road outside the Aughoose compound at various points. This writer has personally seen I-RMS security guards unlawfully act in a manner only warranted to police officers of the state. Despite assurances by Superintendent Pat Diskin who in an article written by Irish Times reporter, Lorna Siggins, denied claims by Shell to Sea that the private security company, I-RMS, was closing roads at Aughoose. This morning the I-RMS did block the road unlawfully. Rossport solidarity camp members, as well as members of the Gardai, witnessed these actions. Gardai are legally obligated to maintain the public order on all public highways at all times whenever possible. This morning I-RMS were exempt from the laws of the state.

Two protesters were assaulted by I-RMS security guards, with one of the protesters being punched in the face. Complaints have been made to the Gardai and statements have been given on the matter. Meanwhile, Rossport Solidarity Camp members stopped work this afternoon at Shrahmore peat deposition site from 4pm until 7pm. This is the second consecutive day that work in Shrahmore has been halted by protesters.

If you want to visit the camp there is plenty for everyone; join in the protests, or help in the garden, or help with site maintenance. The camp is located in a field in Aughoose, between Ballinaboy and Pullathomas. Ring the camp at 0851141170 or email at rossportsolidaritycamp[at]gmail[dot]com

—–

Shell’s work at peat depot halted

Work was halted at Bord na Mona’s Shrahmore peat deposition site on Monday August 8th by protesters from Rossport Solidarity Camp. From 11am up until 6pm four protesters prevented Barrett’s and Lennon’s quarry trucks from entering the site with road building gravel. Inside the compound, two of the protesters climbed up onto a digger in order to stop it proceeding with the road construction on the site.

Shell oil company is planning to dig up 125,000 tonnes of peat from Shruwaddacon estuary and lay down a high pressure raw gas pipeline. The local community have not consented to Shell’s operations. The peat which Shell plans to dig up is scheduled to be dumped at Shrahmore. However, without the presence of adequate road networks within Shrahmore, the heavy peat dumping machinery cannot operate. By halting road building works at Shrahmore from proceeding, protesters are challenging the social, environmental and economic validity of Shell’s activities.

Meanwhile, it has also been announced today that Shell, Statoil & Vermilion have now extended their expected date for when Corrib Gas will flow to 2014. Every year it seems that they push their expected finish date out further and further. Originally the finish date was due to be 2003, so now the project would be 11 years delayed by Shell’s current guess: http://www.irishexaminer.com/business/corrib-pipeline-w….html

Camp Frack: 17th-18th September, near Blackpool

Join the resistance to the “fracking” invasion! Stop the massive expansion of shale gas extraction in the UK! We need renewables and powerdown – not another source of fossil fuel!

Join the resistance to the “fracking” invasion! Stop the massive expansion of shale gas extraction in the UK! We need renewables and powerdown – not another source of fossil fuel!



Camp Frack will take place adjacent to the UK’s first fracking operations at Singleton, near Blackpool (nearest train station Poulton Le Fylde). It will be organised with the support of a local farmer who is providing the land. It will involve locals, grassroots groups, individuals and NGO’s in workshops and discussions on shale gas and on forming effective UK wide resistance against it. It will involve raising local awareness about the problems with shale gas and an action day of protest against the drilling activities currently in progress in the Blackpool area.

More details will be circulated in August regarding venue etc. To be kept up to date or for any questions email campfrack@gmail.com.

‘Mystery Demo’ against a fat cat corporate funder of climate disinformation

London
Wednesday 7th September

Early morning action around 8.00 am.

There will also be a follow up action in the evening around 4.45 to 7.00 pm.

Interested in taking part? You will need to send us a mobile phone number – the location to gather for the action will be texted to you nearer the time.

London
Wednesday 7th September

Early morning action around 8.00 am.

There will also be a follow up action in the evening around 4.45 to 7.00 pm.

Interested in taking part? You will need to send us a mobile phone number – the location to gather for the action will be texted to you nearer the time.

http://www.campaigncc.org/mystery

Stop New Nuclear. Blockade of Hinkley Point on 3 October 2011

WHY HINKLEY?

Hinkley Point, near Bridgwater in Somerset, is the first of eight proposed sites for nuclear new build to go ahead. We stopped them here before, and we can do it again. If they fail at Hinkley, it is unlikely the “nuclear renaissance” will have the momentum to continue.

WHY HINKLEY?

Hinkley Point, near Bridgwater in Somerset, is the first of eight proposed sites for nuclear new build to go ahead. We stopped them here before, and we can do it again. If they fail at Hinkley, it is unlikely the “nuclear renaissance” will have the momentum to continue.

The catastrophe is still unfolding at Fukushima, but the British government is continuing with its plans for building new nuclear power stations – nuclear new-build. While other countries at least put a moratorium on new nuclear, or even make plans to phase out nuclear energy completely, in Britain it’s as if Fukushima didn’t happen. Like a mantra, government and the nuclear industry keep repeating that Fukushima could not happen in Britain because there are no earthquakes of that magnitude. We heard similar excuses after Chernobyl (1986) and Three Mile Island (1979). But nuclear accidents can and do happen – even in Britain; the disaster at Windscale in 1957 released massive levels of radiation into the atmosphere. If we continue to use and expand nuclear power, there will certainly be more catastrophic accidents, not to mention all the other enormous problems associated with nuclear power production, even when it is working ‘normally’.

NUCLEAR POWER IS NOT NECESSARY, NOT SAFE, NOT SUSTAINABLE

– Nuclear power is not necessary. Several studies, from the government’s Sustainable Development Commission to Greenpeace and the Centre for Alternative Technology show that Britain can meet is energy needs without nuclear, and reduce carbon emissions at the same time.

– Nuclear power is not safe. Accidents such as at Three Mile Island, Chernobyl, and Fukushima show the potentially catastrophic consequences of nuclear power. Numerous smaller accidents and incidents also happen at power stations in Britain: at Windscale, Bradwell, Sizewell, and others.

– Nuclear power is not sustainable. Nuclear power depends on uranium mining, which destroys huge landscapes and local communities living there. Uranium itself is a finite resource, and requires huge amounts of energy to be mined.

– Nuclear power is not the answer to climate change. Nuclear power is not as low carbon as the government and the industry want us to believe. In addition, nuclear power is expensive, and takes a long time to build. In short: nuclear power provides too few carbon reductions, too late, and will divert investment from renewable, genuinely low-carbon forms of energy production.

– Nuclear power is a threat to our civil liberties. Because nuclear power stations are potential military or terrorist targets, they pose a threat to our civil liberties. The nuclear police have special powers, and everyone approaching a nuclear power station can be seen as a potential threat.

For more details, see our website at stopnewnuclear.org.uk.

WE CAN STOP NEW NUCLEAR

The government and the nuclear industry want us to believe that nuclear new-build in Britain is a done deal. They want to discourage us from protesting – the message they want us to swallow is clear: opposition is futile, and we will be going ahead anyway! However, that couldn’t be further from the truth. Yes, the government has introduced a framework which effectively will subsidise new nuclear at our expense – as electricity consumers and taxpayers. Yes, the government has effectively deprived local communities from having a say in the planning process for new nuclear and other major infrastructure projects thus dumping a crucial cornerstone of local democracy.

But nuclear new-build in Britain is already behind schedule and has faced legal and other setbacks. Public concern is mounting following the Fukushima disaster. If we can stop the building at Hinkley, we can stop the whole process. Now is the time to mobilise and take action.

New-nuclear in Britain is far from being a done deal, and we can still stop it!

NEW NUCLEAR — STOP IT AT HINKLEY!

The action: A non-violent blockade of Hinkley Point nuclear power station in Somerset

On 3 October 2011 we will – with hundreds of people – non-violently blockade the access to Hinkley Point nuclear power station for one day.

While the blockade will be the key focus, there will be plenty of roles and activities for people who do not wish to risk arrest. So everyone who is anti-nuclear can come and join us on the day to express their opposition in many different ways. We will prepare ourselves for this blockade with non-violence training, and we will not be deterred by police trying to prevent our non-violent action. The blockade will be inclusive, allowing people from all walks of life and with a wide range of experience in non-violent action – or no experience at all – to participate. We will organise a safe environment for everyone, built on trust for each other, but also on our determination to stop nuclear new-build.

In the days before the blockade, there will be local actions in Bridgwater. There will be a camp and local accommoda­tion for people over the weekend and non-violence training will be provided.

More information at stopnewnuclear.org.uk.

PLEDGES
(All signatories of the pledge will receive a briefing pack and be kept informed of the progress of our campaign by regular email updates)

Blockading pledge
This pledge is for people who want to join the blockade of Hinkley Point on 3 October 2011.
Sign the blockading pledge.

Supporting pledge
This pledge is for people who want to support the blockade of Hinkley Point on 3 October 2011, but do not want to risk arrest, or cannot make it to Hinkley Point on the day.
Sign the supporting pledge.

Organisational pledge
This pledge is for groups and organisations that want to support the blockade of Hinkley Point on 3 October 2011.
Sign the organisational pledge.

Outdoor skillshare 2011! 26-29th August, South Lanarkshire

Much more information about the event has been uploaded here: http://outdoorskillshare.noflag.org.uk/

Coal Action Scotland warmly invites you to join us in beautiful rural South Lanarkshire for a weekend of skillsharing and workshops about outdoor life and resistance techniques. From mass catering to foraging wild foods, from land defence to self defence, from climbing trees to digging tunnels and everything between; come and learn new skills, meet new people and share your experiences with others.

Much more information about the event has been uploaded here: http://outdoorskillshare.noflag.org.uk/

Coal Action Scotland warmly invites you to join us in beautiful rural South Lanarkshire for a weekend of skillsharing and workshops about outdoor life and resistance techniques. From mass catering to foraging wild foods, from land defence to self defence, from climbing trees to digging tunnels and everything between; come and learn new skills, meet new people and share your experiences with others.



Since the occupation of Mainshill Wood and the recent nine month occupation of Happendon Wood, Coal Action Scotland has had much collective experience of occupying and defending land along with sustaining and growing a community of resistance. The skillshare was conceived of because even though we have lots to share, we still have much more to learn and we hope to collectively empower ourselves and others to increase our mutual capacity for effective action.

This skillshare will be a safe, inclusive and participatory environment for learning new, interesting and transferable skills and is open to people of all abilities and experiences. Whatever your particular campaign, whatever interests or excites you, the skillshare will be a creative melting pot of ideas and techniques to sustain life and resist oppression (however it manifests itself).

Check the website or join our mailing list to receive updates as they happen and feel free to contact us with any suggestions/requirements/questions you may have at outdoorskillshare [at] riseup.net.

**Solidarity with Dale Farm: At the same time as the Outdoor Skillshare will be taking place, Camp Constant will be holding a skillshare at Dale Farm, in solidarity with 90 families facing eviction from the UK’s largest traveling community. The two skillshares, although at the same time, are supporting each other – if you can’t come to one, please come to the other! http://dalefarm.wordpress.com/**

Polish nuclear programme and the protests against it

August 2011
Shortly after the end of 1990 moratorium the Polish pro–nuclear lobby, based around National Atomic Energy Agency (state institution of nuclear safety) and academic institutions involved in development of nuclear technologies, supported by international nuclear lobby has started to work on the new plans of building the nuclear power plants in Poland.

August 2011
Shortly after the end of 1990 moratorium the Polish pro–nuclear lobby, based around National Atomic Energy Agency (state institution of nuclear safety) and academic institutions involved in development of nuclear technologies, supported by international nuclear lobby has started to work on the new plans of building the nuclear power plants in Poland.

1984 – 1990: Autonomous movement stops the construction of Zarnowiec NPP

In the early Seventies the Polish government decided to build two nuclear power plants, based on Soviet technology ( with four pressurized water reactors VVER 440 each – similar to ones in Temelin NPP in Czech Republic and Kozloduj in Bulgaria, build by a Skoda plants in Czech Rep.) in Zarnowiec and Klempicz. The construction of Zarnowiec plant started in 1982 in the midst of the economic breakdown and political repressions of the Martial Law.

The first protests against Zarnowiec NPP, organized by academic ecological groups, started in 1984, but to no avail. It was only after the 1986 Chernobyl disaster when the opposition against the plant gained momentum and public support.

Soon after the loose coalition of anarchist and green activist with a group of young members of various anti–government political groups (including then illegal Solidarity), and Catholic Youth activists has emerged and started to organize own street protests and propaganda in various cities across the country.

In early 1989 the protest movement, still informal and based on a non–hierarchical agenda, started to organize weekly street marches in Gdansk, a city 50 kilometres from the site of Zarnowiec NPP, as well as similar actions in Warsaw, during the government session on the nuclear programme.

The anti–nuclear movement grew stronger and stronger, with new groups and organizations joining the protests. In the political turmoil of 1989 the protest against the Zarnowiec NPP was seen as protest against the crumbling dictature of the communist party, so many participants have joined the street demos for pure political reasons – but the movement itself kept its apolitical character. Soon, even for the majority of nuclear scientists involved in the project it became apparent that the soviet technology used in the plant is unreliable and obsolete, and the safety and technological standards at the construction site are appalling (according to Jany Waluszko, one of the anarchist activists involved in protests, during the construction of Zarnowiec NPP around 300 000 tons of cement was stolen from the site – deficit at a time construction materials stolen from the site soon become major source of income both for the workers and the local dwellers. As a result, during harsh winter made of reinforced concrete foundation of one of the reactors has cracked, due to the very low content of cement in the concrete – replacing stolen cement with a sand in the mixers was a common way of concealing the theft…).

During the Round Table negotiations between Solidarity and the communist party in spring 1989 the Solidarity demanded the construction of Zarnowiec to be abandoned – as the result the question of nuclear programme was the only one not agreed in the process but, when Solidarity took over the power in August 1989 the Mazowiecki government refuse to authorize such a decision. It led to the further escalation of protests – with a hunger strike, occupation of local government buildings in Gdansk and a three months blockade of the Gdynia harbour, where the parts of the nuclear reactor were delivered (against the own government position, rank and file organization of Solidarity in the harbour refused to unload the reactor from the ship and call for a referendum on the nuclear programme).

After three months stand-off, the reactor was unloaded by the Zarnowiec NPP workers and the blockade of the harbour was broken, but faced with the ever growing opposition from protest movement and rank and file members of Solidarity (a call for referendum was soon supported by 110 factory comities of S. in Gdansk region and large group of MPs representing the Citizens Comities – political arm of Solidarity) the government was forced to suspend construction of Zarnowiec NPP for one year, at the beginning of 1990.

Such a decision didn’t calm down the protests: the group of activists continued an indefinite hunger strike in Gdansk, started on 8 of Dec, 1989, and growing numbers of local organizations calling for a referendum. Such a social referendum, organized solely by local structures of Citizens Comities and the protest movement activists was announced on 25 of Jan. 1990 and held in Gdansk region, against the will of the Warsaw government, on 27 of May (prime minister Mazowiecki called the referendum “undemocratic” and refused any material support to it!). In major organizational effort the protest movement printed and distributed almost two millions of ballot papers, and organized polling stations across the region. As a result, it achieved the turnout of 44%, with 87% of votes against the NPP and 13% in support of it.

The government initially refused to accept the results, but faced with growing opposition from local communities (virtually blocking the construction site with farming equipment and tractors), the governments of other Baltic countries (afraid of the plant, based on soviet safety standards) and serious economic difficulties was forced to abandon the construction of Zarnowiec NPP on 4 of Sept. 1990. This decision was later (9 of Nov.) confirmed by a bill passed through the parliament: it also imposed the 15 years moratorium on new nuclear programmes and demanded a national referendum to authorize it. (the referendum has never been held and the work on new nuclear programme started in 2005).

2005 – 2011: Second nuclear programme

Shortly after the end of 1990 moratorium the Polish pro–nuclear lobby, based around National Atomic Energy Agency (state institution of nuclear safety) and academic institutions involved in development of nuclear technologies, supported by the international nuclear lobby has started to work on the new plans of building the nuclear power plants in Poland.

After the 2007 elections, won by the neoliberal Civic Platform, this plans got support from the Ministry of Economy, and on 10 of November 2009 became a part of National Energy Policy 2030. Half a year earlier, on 15 of May 2009 Hanna Trojanowska was appointed as a Government Commissioner for Nuclear Energy (in 1982 – 1991 Trojanowska worked as a designer of first Zarnowiec NPP, and later held senior managerial positions in state – owned PGE energy corporation – soon chosen as an operator of future Polish NPPs…).

Since her appointment the government and the nuclear lobby, linked now on personal level, have worked hand in hand towards the development of nuclear programme: on 16 of August 2010 official Program of Development of Nuclear Energy was adopted by the government, and by the end of March 2011 governmental projects of thirst two bills on nuclear energy: the amendment of Nuclear Energy bill (dated back to mid–80s) and the Bill on Investment in Nuclear Energy where submitted to the parliament. At the same time the Ministry of Economy published the assessment of 27 sites around the country, considered as a potential location of the NPP, with Zarnowiec as a winner an Klempicz (a village in North West of Poland, around 60 kilometers north of the city of Poznan) as a runner up.

In May 2011 the governmental plan of the pro-nuclear propaganda campaign (including nuclear ‘product placement’ in popular TV series) has leaked to independent media, but was completely ignored by the mainstream ones. The cost of the campaign was estimated by its authors at around 20 milion euros, paid with taxpayers money.

By the end of June both chambers of the parliament has passed the ‘nuclear’ bills, submitted by the government, and from 1 of July both acts has come into force – without any public discussion or attention and any major amendments.

According to the governmental plan, by the year 2030 demand for electric power in Poland will increase by 30% comparing to 2010, and by 2020, due to the limits on emission of carbon dioxide imposed by EU, higher costs of emission rights and a necessity of introduction costly technologies limiting the emission of greenhouse gasses (like CCS) in thermal power plants the cost of production of energy in NPP’s will be comparable to the power plants using lignite as a fuel. In response to this challenges by 2030 more than 15% of electric energy should by produced by NPP’s.

To meet this demand, the government is planning to build two nuclear power plants, first one by 2020 and second by 2030. The governmental sources varies, when it comes to the power rating of the planned plants, with initial plans suggesting that each plant will produce around 4400 MW (in four 1100MW class reactors). This was later (in 2010) downgraded by commissioner Trojanowska to around 3000MW each (yet again, other officials of Ministry of Economy opt for 3600MW, produced by two 1800MW class reactors). Considering the power output of modern reactors, it’s likely that the final rating will be 3200MW a plant. The total cost of building this capacity is estimated by Trojanowska at 20 bilion Euros (this estimation is based on 4400MW variant – the Ministry of Economy is estimating the cost of building the nuclear plant at 4500 Euros for 1kW, which makes 16 bilion for a 3600MW plant and 32 bilion for a whole program). The cost of building the plants will be beared by the investor and operator of the plants – state-owned PGE (Polska Grupa Energetyczna – Polish Energy Group) power corporation. The direct public involvement in nuclear programme is to be limited to around 18 milion Euros over next ten years, that include establishing the modern nuclear safety service and construction of large scale nuclear waste storage.

The government plan doesn’t mention the location of the storage facility, as well as the preferred technology of storage (with classic nuclear waste damp site and more sophisticated nuclear recycling plants considered). Asked about it by the journalists, Trojanowska has avoided direct answer and promised, that by the 2011 (half a year after the nuclear programme itself!!!) the plan for dealing with nuclear waste produced by the plants will be adopted. As for August 2011, no such plan was ever published.

Regardless of it, the Ministry of Economy has published the shortlist of three Generation III+ reactors, considered for Polish NPP’s. This include:

Westinghouse AP1000 – for a 4400MW a plant variant, and probably it’s upgraded version, CAP1700, for a 3200MW variant. The design was never tested in practice, with the first reactor to become operational in China in 2014, yet it has already risen the safety concerns, both from the nuclear safety authorities in USA (external shield suspected to be vunerable to terrorist attack and earthquakes) and UK (original design rejected due to a faulty design of valves in cooling system and, once again – design of the external shield) and environmental groups (design of containment vessel prone to corrosion and leaks).

Areva/EDF/Siemens EPR – rated at 1650MW for a 3200MW variant. None of EPR reactors operational as for 2011, four in construction in Europe (2 in Finland and 2 in France) – due to serious design faults the original EPR projects were to be altered during the construction causing over two years delay and rise in cost. Safety concerns by Finnish and French nuclear safety authorities, UK one rejected a design after finding serious faults in safety systems design (the main and emergency control systems are interconnected so the fault in main one might disable the emergency controls as well).

Hitachi/GE ESBWR – boiling water reactor with innovative, but never tested in practice, passive cooling systems. Rated at 1600MW, never build, is expected to be granted US nuclear safety authority approval by the end of 2011. Considered for new NPP in Lithuania.

As the governmental nuclear programme was made public, it was criticized both by environmental organization and by some leading scientists in the field of energy production. Professor Wladyslaw Mielczarski from the Technical University in Lodz, Poland, one of most senior experts in this field in the country and EU, denounces the basic thesis of the nuclear program as unrealistic, he’s also questioning the governmental estimations on consumption of electric power, costs of building of NPP and producing energy in such a plants. According to Mielczarski, in contrary to nuclear program figures, the demand for electric power in Poland might increase by no more than 10% by 2030, but just as well it might remain on the 2010 level or drop, due to the higher costs of energy and introduction of less power – consuming technologies. This put the need for building of NPP in question. Professor also stresses the need of building a new gas or coal power station together with NPP, to create a necessary backup power supply in case of reactor shutdown and sudden drop in power production.

Mielczarski strongly criticizes the financial estimations of the government, according to professor:

– the cost of building the NPP estimated in government program is far too low, especially after necessary alternations to reactor design after Fukushima disaster

– as a consequence, the cost of production of power in NPP in year 2020 will be around 60% higher than in thermal plants, even if the CO2 emission fees goes up as planned

– governmental claims that the construction of the NPP will be financed by a private sources are completely unrealistic, as the chosen investor, PGE corporation, can only borrow around 4 billion Euros of capital, and the estimated cost of nuclear program is 8 times higher

From the environmental and social point of view, it’s worth to cite the report of Jan Haverkamp, the energy expert from the Netherlands who prepared the assessment of governmental Strategic Environmental Assessment of the nuclear program. According to Haverkamp, the whole document, consisting of more than 785 pages was prepared in less than one month, and doesn’t meet the international standards of professionalism for such a documents. Many of it’s content was simply copy-pasted from outdated brochures, issued by nuclear corporation, without citing the source(!!!). Assessment of the spread of nuclear contamination in case of accident was taken from a similar document, prepared for one of the NPP in UK (!!!), without any research actually being done in Poland. The document doesn’t deal at all with potential consequences of major nuclear accident or radiation leak, on the scale of Fukushima or Chernobyl, basically treating such an event as impossible. Havercamp also points out that the whole document and a procedure of its public consultation breach the rules set by Aarchus Convention on public participation in decision – making, signed by Poland: it doesn’t include any alternatives to the proposed construction of NPP and a time, set by the government for its public consultation is insufficient (21 days!).

The public perception of the nuclear programme and the support for nuclear energy changed significantly after Fukushima. According to the polls., the support for the programme has dropped from 50% in September 2009 to 40% in April 2011 (when the scale of Fukushima disaster was yet unknown).

Together with a public preferences, the policy of the government and nuclear lobby has changed as well. At the beginning of 2011, when the official introduction of the nuclear programme to the public opinion was being made, there was a strong presence both of pro-nuclear politicians and scientist from the nuclear lobby in the media, even by the time of Fukushima disaster they were still trying to defend both the programme and nuclear energy.

After Fukushima, and the initial wave of protests after it, the nuclear propaganda and the whole issue of nuclear energy disappeared from the media – pressed by the journalists or activists the politicians claim, that the whole issue is not decided yet and the further researches and discussions are needed.

Contrary to this official line, the government carries on with a programme – away from public attention two nuclear bills were hurried through parliament in one month, with no serious discussions or opposition, two months before parliamentary elections.

As far as mainstream politics is concerned, there is no serious opposition to nuclear programme, with ruling neoliberals (Civic Platform) strongly in favour of it, its allies from Popular Party officially talking about a ‘need for discussion’ and in private supporting the program, and Social Democrats calling for national referendum on nuclear energy. The right wing opposition, the Law and Order party, doesn’t present a clear stance regarding the nuclear programme. It was to be added, that as well as in many important issues in polish politics, all the mayor parties are trying to avoid a public discussion and public involvement in decision making, focusing the public attention on ideological, personal or historical conflicts instead. Because of it the nuclear programme and building the NPP is not likely to became a major point of discussion during the coming election campaign.

As for the non-parliamentary organizations, the whole environmental movement (with polish Green party – marginal in the mainstream politics), the anarchists, and a independent trade union Sierpien’80 (consisting of 10000 members – mainly coal miners…) are strongly against the nuclear programme.

On a street protest level, until 2011 the major protest group was Inicjatywa Antynuklearna (Anti–Nuclear Initiative), the coalition of grassroots environmental activists, concerned scientist and anarchists. The IAN split in early 2011 over the issue of tactics and cooperation with political parties and mainstream NGOs, and since then the Anarchist Federation started it’s own, anti–nuclear campaign.

Anarchist Federation against nuclear power

The beginning of 2011 marks the start of anti-nuclear campaign of AF – PL. The statement on that issue, adopted by the sections of FA ( http://www.federacja-anarchistyczna.pl/dokumenty/item/5-oświadczenie-fa-w-sprawie-rozwoju-w-polsce-energetyki-nuklearnej) focuses on economical and social costs of nuclear program, it also denounces the construction of NPP as a transfer of public resources to transnational corporation providing the nuclear technology. The further developments in nuclear issue unveiled the deeply undemocratic character of decision – making, with the government openly ignoring own obligations regarding public consultation of the program and avoiding and discussion on the nuclear power question. This was reflected and condemned in further statements and leaflets, issued by various local sections of AF and during the street protests organized by them – in future, this will also be the focal point of our campaign.

So far on the street level there were two major AF mobilizations against nuclear programme and a couple of local events:

– shortly after the Fukushima disaster, on 19 of March there was a demonstration against building NPP in Lodz, and similar one, two days later in Gdansk (second one was organized by broader coalition, called Pomorska Inicjatywa Antynuklearna – Pomeranian AntiNuclear Initiative)

– the 25 anniversary of Chernobyl disaster was marked with a demonstrations and public meetings in Lodz, Poznan, Gdansk, Krakow, and Czestochowa, all organized or co-organized by local AF structures

– on 8 of May in Lodz a group of anarchists disrupted a meeting with deputy prime minister W. Pawlak at the technical university unfurling the banner against nuclear energy

– on 18 of May, during the conference on nuclear power held as a part of European Economic Forum in Katowice there was a demonstration against the nuclear power organized by Silesian activists of AF

As a part of a campaign, a brochure on the nuclear energy issues will be printed, there will be also a lecture and workshops on that topic during this year summer AF-PL camp in Beskid Makowski, starting 14 of August.

Web site of Anarchist Federation of Poland:
www.federacja-anarchistyczna.pl
contact: biurofa@gmail.com

Shell Demo in solidarity with Rossport resistance

Thursday 18th August 2011

At 6pm on Thursday evening, people gathered outside the Shell petrol station on the Carlton Road, Nottingham.

Thursday 18th August 2011

At 6pm on Thursday evening, people gathered outside the Shell petrol station on the Carlton Road, Nottingham.

This protest was an act of solidarity with all those who are fighting against the building of Shell’s destructive gas pipeline in Rossport, Ireland. Following over 10 years of battling with the local community, work began on laying the pipeline a few weeks ago, and people are continually blockading to delay Shell

The police responded with a couple of officers arriving with 5 minutes from the banners being unfurled!

To the amazement of those present, the filling station staff then closed down and put barriers across the entrances. They did this on direction from management, apparently in the name of health & safety.

In about equal measure, drivers were upset at not being able to fill up …. and the number of people hooting support and taking leaflets.

Just up the road, the police had placed a sign saying that there was a police operation in progress and to excuse any inconvenience that might be caused. Gosh ….. all a bit OTT.

additionally ….. there is now an oil-spill emergency in the North Sea.

The flow of oil from the worst spill in UK waters in the past decade, at one of Shell’s North Sea platforms, has been “greatly reduced” but not yet stopped completely, the government said on Monday.

Conservationists warned that the leak could harm bird life in the area, at a delicate time in their development, as the oil company worked to minimise the damage.

Stuart Housden, director of RSPB Scotland, said: “We know oil of any amount, if in the wrong place, at the wrong time, can have a devastating impact on marine life. Currently thousands of young auks – razorbills, puffins and guillemots – are flightless and dispersing widely in the North Sea during late summer. So they could be at serious risk if contaminated by this spill.”

http://www.guardian.co.uk/environment/2011/aug/15/north-sea-oil-spill

I note about a week ago, the Shell PR dept were pushing the line that the spill was not at all significant. No, not at all!! Then, more recently, it has transmogrified into the most serious spill in the North Sea in last 15 years.

Oh … then of course there are the many spills in the Niger Delta in Nigeria. Plenty to complain about I think.

for more info … email NSN[at]riseup.net

Rossport Solidarity Camp

More photos, http://nottingham.indymedia.org.uk/articles/2005
http://www.rossportsolidaritycamp.org

Site evicted at Huntingdon Lane

19th August 2011
Campaigners were this afternoon evicted from the site of a massive new mine in Telford after defying UK Coal bosses for 18 months.

An eviction team working on behalf of the company was sent onto the site in Huntington Lane, Little Wenlock, this morning to remove the protesters and destroy their camp.

19th August 2011
Campaigners were this afternoon evicted from the site of a massive new mine in Telford after defying UK Coal bosses for 18 months.

An eviction team working on behalf of the company was sent onto the site in Huntington Lane, Little Wenlock, this morning to remove the protesters and destroy their camp.

Tents and platforms were set on fire and the protesters were escorted from the makeshift camp, which was set up in February last year.

Suzy Murphy, one of the protesters, said: “They came in this morning and there was about 20 of them.

“They came in with a full team of tunnellers and cherry pickers. They caught us a bit unaware because some had gone off site.”

Huntington Lane Protest Site Under Eviction Now!

19.8.11

19.8.11
The national eviction team came onto site this morning and escorted support crew off and are busily taking down ground structures. Unfortunately the police helicopter drew a low headcount last night so bailiffs decided to move in, with not enough numbers to occupy all the defences, protesters are concentrating their efforts on the tunnels.

Supporters come to 4 East View, Waters Upton, Telford or call 07580477901.

http://defendhuntingtonlane.wordpress.com/